22,223 permits · Other · NY
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Remove the existing curb cut and restore original condition.address ecb violation 34566578k
Filing for pipe scaffolding installation on behalf of contractor
8936 - Extending existing elevator shaft to accommodate larger cab. No change in egress use group or occupancy. Pro Cert Requested.
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Installation of a medium duty pipe scaffold as per plans in conjunction with general construction work. no change in use, egress or occupancy. pipe scaffold shall comply with 2022 nyc building code,ch...
Filed herewith mechanical work type in conjunction with dob now application #q01332262-i1
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the nyc building code.live...
Proposed installation of heavy-duty sidewalk shed and supported scaffold as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no chang...
Proposed Structural for a Nine Stories Building + Cellar + Sub-Cellar. Amend plans based on architectural change.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Sprinkler work as shown on plans filed herewith.
Temp. construction fence
Subsequent fence application filed herewith.
Legalize accessory masonry/shed 196.6 sf
Filing SOE work for Reach 7 - Filing for the construction of a flood barrier system for the BPCA North/West Battery Park City Resiliency project including support of excavation for the proposed constr...
Install new sprinkler heads and related piping on 1st floor for new eating & drinking establishment. no change to use, egress or occupancy.
herewith filed for an 8 ft plywood construction fence
Sub-Slab Depressurization System for New School Building
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com