168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Install commercial kitchen exhaust system in the commercial space. change of use egress or occupancy.
Altco filed for interior renovation and tenant fit-out on the 1st floor commercial space, and cellar floor change to a coffee shop as per plans filed herewith.
Interior fit-out of existing space. no change of use, egress or occupancy under this application.
Proposed a semi-detached two-family dwelling unit building with two off-street parking spaces.
Hereby filing to construct a demising wall in the ground floor retail space as shown on plans filed herewith. No change to use, occupancy or egress.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
8.0 high wood/plywood construction fence located in open space inside the property line.
8.0 high wood/plywood construction fence located in open space inside the property line.
Reno. of exist. commercial space to create commercial spaces for the school of culinary arts & school of fashion. scope includes installation of drywall partitions & non-production…
Construction of new interior non-load bearing walls and ceilings with wall, floor and ceiling finishes on first and second floors of existing commerical space.
interior fit-out and change of use of an existing basement-level tenant space. The space is being converted from light industrial/manufacturing use (D-2) to an assembly use (F-4) f…
New 18 story residential building with commercial space on the first floor. west side 12 stories, east side 18 stories.
Interior Renovation of an existing commercial retail space. No changes to use, egress, or occupancy.
Filed herewith interior renovation of existing retail space at cellar and 1st floor accessory to wellness center. Scope of work will include installation of convenience stair and L…
Interior alteration to the 8th floor to include assembly space in conjunction with current business use occupancy. Filed in conjunction with PA M01334767-I1.
New underpinning of the crawl space and cellar. no change in use, egress or occupancy under this application
Remove existing fire water service point of entry piping and provide new secondary backflow prevention and meter assemblies. Modify local branch cold water piping and sanitary drai…
Bellevue hospital is fitting out an existing 9th floor lab as new it/mdf room. room will be protected with a dedicated single interlocked electronic actuated sprinkler system, with…
Interior alteration to the 8th floor to include assembly space in conjunction with current business use occupancy. Filed in conjunction with PA M01334767-I1.
Interior fit-out of existing space. no change of use, egress or occupancy under this application.
Filed herewith interior renovation of existing retail space at cellar and 1st floor accessory to wellness center. Scope of work will include installation of convenience stair and L…