168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
3051 Valley View
Installing a new 60 amp dedicated circuit to support a Tesla wall charger.
7 day - finish out admin office - ova
new construction - new 19x14 single story closed structure that will be on pier and beam foundation. electric is needed for outlets and lights as well
Temporary meter loop for construction power only. Service will be used during construction (less than 24 months) and will be removed once permanent el
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
ePlan: Residential Expedited Review - New construction of a 3-Story Single Family Res. [4bed 3.5bath] with Attached Carport. Bldg 5
HEB Auto on the Run
Meterloop rebuild
ePlan: Residential Expedited Review - New Autofill/Heated pool with Spa.
Existing
ePlan: Residential Expedited Review - New construction of a 3-Story Single Family Res. [4bed 3.5bath] with Attached Garage. Bldg 4
Replacing MEP-ELE-PMT22-33313665
New construction in-ground pool and spa.
INTERIOR REMODEL TO FIRE & WATER DAMAGED APARTMENT: replace GWB replace insulation where necessary replace MEP appliances & fixtures in-kind (18 apps)
Install 2 new redesigned Stair Press Fans to the Ascension Seton Womens Tower project due to the existing ones do not meet the airflow requirements. T
Request electrical permit for a Temp loop 2026-053683 BP
Installation of 18 EV charging stalls and associated electrical equipment. Renovation and reinforcing of existing retaining wall.
Free standing 600 amp underground electrical service rack
New
T pole ref; 2026 046788 BP