168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Proposed mechanical work to apartment #11c, replacement of air conditioning system with new split unit a/c handling units, ductwork, and air distribution system.
Hereby filing to install new mechanical units with associated ductwork and piping for restaurant fit out as shown on plans filed herewith. No change to use, occupancy or egress.
Modification to Mechanical systems as per plans filed herewith.
Modifications to the existing Mechanical systems equipment and ductwork on the 5th floor as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.
Filing to protect neighbor during minor facade repair work. this system is a site specific engineered enclosure system subject to the requirements of bc 3309.17. no change in use,…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Herewith filing for general construction and mechanical system as per plans filed herewith. no change in use, occupancy or egress.
Installation of material only hoists as per drawings. hoists shall comply with ch #33 of the nyc bldg code. no change in use, occupancy or egress under this application.
General renovation on exist. commercial space with, repair/replace/new partition, floor, ceiling, door and painting, also install new split type a/c as per plan. no change in use,…
Interior renovation of existin apartment 8d on 8th floor along with the hvac installation as per plans submitted. no change in use, egress or occupancy.
Direct replacement of mechanical units on the 4th floor. no change to use, egress, or occupancy.
Existing one family house extension with earthwork, foundation, mechanical system & structure. ea: excavation, site grading and fill, fo: concrete foundation for extened house, ms:…
Installation of overhead protection and shoring as per plans. all equipment shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this applicat…
Filing herewith mechanical/hvac installations, additions, and modifications to MER room Mechanical systems as per plans. No change in use, egress, or occupancy in this application.
Modifications to existing ductwork as per plans filed herewith. No change to use, egress, or occupancy.
Emr ac replacement- remove ac and install replacement ac equipment with related mechanical modifications as per plans filed. no change to use, egress or occupancy.
File mechanical work of mixed-use building on 1st floor commercial space to install 6 new split a.c. units as per plan.to address ecb violation# 39180209p
New Installation of Oil and Gas Boiler as shown on plans
Installation of a temporary overhead protection via sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupan…
Mechanical changes as indicated on plans.
Install kitchen exhaust and make up air systems