10,267 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
P.S. 206-K: PLUMBING CIVIL. Site removals, erosion measures and details.
Plumbing work in association with primary mechanical filing s01371774-i1. no change to egress, use, or occupancy.
No change in use, egress, occupancy and bulk.1) legalize plumbing fixtures on cellar floor and cap and remove plumbing fixtures at attic floor
Plumbing & sprinkler modifications as per plans filed herewith. No change to use, egress, or occupancy.
Plumbing work as shown on the plans.
Installation of new 3 piece bathroom at cellar (cel) consistent with the crfn declaration 2025000257140. replacement of fixtures in the first floor kitchen, bathroom and second flo…
As per hub consultation filed in conjunction with NB #121205604 for Modification to existing plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy un…
Filing herewith plumbing work as per plans.
Plumbing work on exist. residential house with cap/remove/replace/new kitchen and bathroom fixtures as per plan. no change in use, egress or occupancy.
Interior renovation of unit #54 on the 45th floor, replacement, removal and new plumbing fixtures. no change to use, occupancy or egress.
Install new sprinkler system (53 new heads). install new plumbing fixtures at new roughing (2 w/m, 1 f.d., 7 lavs, 5 wc, 3 showers, 2 sinks, 2 dw, 1 tub). install new gas piping (2…
File plumbing work of existing 2-story residential building to replace gas meter and obtain gas authorization. no change in use, egress or occupancy.
Plumbing work for the minor renovation of an existing bathroom as per plans filed herewith. no change in use, egress or occupancy.
Installation of plumbing fixtures. No change in use, egress, or occupancy.
Removal of existing plumbing fixtures and associated piping (Early Demo Package 1) as per plans. No change to use, egress or occupancy.
Install plumbing fixtures in first floor and cellar. No change to occupancy use or egress under this application
The Alteration application is being filed for the plumbing work for the installation of new water connection with the RPZ backflow Preventer at the subject premises as per plans su…
Install a new sump pump and replace a section of associated piping with new.
Filing herewith plumbing installations, additions, and modifications, including but not limited to water piping, RPZs, electric hot water heaters, pumps, fixtures, etc. as per plan…
1ST