168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Reno. of exist. commercial space to create commercial spaces for the school of culinary arts & school of fashion. scope includes installation of drywall partitions & non-production…
Altco filed for interior renovation and tenant fit-out on the 1st floor commercial space, and cellar floor change to a coffee shop as per plans filed herewith.
Construction of new interior non-load bearing walls and ceilings with wall, floor and ceiling finishes on first and second floors of existing commerical space.
8.0 high wood/plywood construction fence located in open space inside the property line.
interior fit-out and change of use of an existing basement-level tenant space. The space is being converted from light industrial/manufacturing use (D-2) to an assembly use (F-4) f…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Proposed a semi-detached two-family dwelling unit building with two off-street parking spaces.
Remove existing fire water service point of entry piping and provide new secondary backflow prevention and meter assemblies. Modify local branch cold water piping and sanitary drai…
New 18 story residential building with commercial space on the first floor. west side 12 stories, east side 18 stories.
New underpinning of the crawl space and cellar. no change in use, egress or occupancy under this application
Hereby filing to construct a demising wall in the ground floor retail space as shown on plans filed herewith. No change to use, occupancy or egress.
Interior Renovation of an existing commercial retail space. No changes to use, egress, or occupancy.
8.0 high wood/plywood construction fence located in open space inside the property line.
Submit temporary construction fence at open space, in conjunction with alt-co application #:b01357335-i1. no change in use, egress or occupancy.
Interior build out in existing commercial space for new tenant Alo. Remove/install non load bearing partitions, flooring, ceilings, finishes and fixtures as per plans filed herewit…
Structural work in commercial space for new tenant build out for Alo per plans filed herewith. Work in include trellis support. No change in egress, use or occupancy.
Interior renovation of existing office space including the installation of partitions, doors, floors, and finishes on the 32nd Floor (Moroccanoil Office), as per plans. No change t…
Interior renovation of existing commercial space unit# 800 on 8th floor. Work includes split type heatpump ac unit and installation of partition wall at unit# 800. No change in use…
Interior alteration of existing commercial space on 2nd and 3rd floor, including architectural work.
Sprinkler work took place within a new supermarket space. No change in use, egress or occupancy.
Sprinkler work as shown on plans filed herewith for BPCA space. No change to use, egress or occupancy.