22,734 permits · Other · NY
Filing for the installation of pipe scaffolding on behalf of contractor
Installation of construction fence for public protection from areas of construction work
proposed installation of a temporary sidewalk shed as per plans submitted. Work shall comply with 2020 building codes, chapter 33. No change in use, egress or occupancy.
Temporary shoring to address violations, as per plans filed herewith. No change of use, egress, or occupancy.
Installation of temporary sidewalk shed as per plan. no change in use,egress or occupancy
Installation of temporary debris chute per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Verizon Modification. Replace 6 RRH units, remove 1 cabinet with existing platform, install new platform with cabinets. Install 2 microwave antennas, install 1 GPS antenna
Filing for temporary fence for construction job site as per plans filed herewith. no change in egress, use or occupancy.
Installation of heavy-duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code.
Modifications to the existing sprinkler system on the 1st floor (Property Management Office) as per plans. No change to use, egress or occupancy.
File soe in conjunction with job#q01231314
Install medium duty scaffolding as per plans. pipe scaffolding shall comply with chapter 33 of the 2022 nyc building code. no change in use, occupancy, or egress under this application.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Restore basement to the previous legal condition to resolve rca complaint #4986453 as per the plan filed herewith. no change in use, occupancy or egress.
Ira rope access facade inspection
Installation of supported scaffold for work locations access
Temporary fence job filed in conjunction with alt i q01300801-i1
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of heavy-duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code.
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com