168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
General construction including demolition of non-bearing interior partitions and finishes, as shown on plans filed herewith. No change in use, egress, or occupancy.
interior non-structural demolition
Retro active demo of mobile home circa 1972
Full demolition to a four story building
Eplanrenovation of tenant suite 1600 located on 16th floor of existing office building.architectural demolition activities to include: removal of select non-loadbearing interior wa…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Interior renovation to include demolition and construction of partitions in an existing office space. No change is use, egress, or occupancy.
Full demolition to a one story building
Full demolition to a one story building
Full demolition to a one story building
Interior demolition on existing two (2)-family, three (3) story brick residential building with basementand cellar.no change of building bulk, occupancy or egress
Demolition of one story (e) sfd. comply with department order effective date 08/24/2022. permit will expire 30 days from issuance date
Demolition
ePlan: Demolish existing single family dwelling and detached garage
1413 Lanier PL Demo (RES)
This job is filed for demolition of two story house.
Total demo of sfr 1433 sqft circa 1942
Roposed interior demolition of an existing split level 2-story, with cellar 1 family residential building. repair of existing ceiling, sub-flooring, and partition as per plan . no…
ePlanDemo detached Rec room.
installation of construction fence to protect site during full demolition
Install medium duty scaffolding for demolition work as per plans. pipe scaffolding shall comply with chapter 33 of the 2022 nyc building code.