3,978 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Interior demolition of non load bearing partitions on the 27th floor (former Orchestrade ) as indicated on drawings.
FILING OF TEMPORARY CONSTRUCTION FENCE WORK TYPE IN RELATION TO FULL DEMOLITION (X01321995) & NB (X01325844-i1 & X01362398-i1)
eplanDemolish detached garage
Demo (e) garage
Demolition of existing garage. sewer cap not required.
Demo (E) detached garage 357 sf
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 17th floor as per plans. No change to use, egress or occupancy.
installation of construction fence to protect site during full demolition
Interior Demolition of Non Structural partitions and interior finishes
Demolition - Interior
Full Demolition - FOR COMPLETE DEMOLITION OF AN EXISTING STRUCTURE. SEPARATE PERMIT REQUIRED PRIOR TO NEW DEVELOPMENT.
Full Demolition - Complete Demolition to create a vacant lot.
7th fl:demolition of non-stru. partitions & associated power/data,(e)equipment, & finishes throughout. no ceiling or lighting demo. space is currently un-occupied. per ab-017: fire…
23rd floor ste 2325: construction of new non-structural partitions, glazing, doors, millwork, ceiling, lighting, pwer and finishes. there will be no change in occupancy, use, or fl…
City Demolition - Sub Demolition Permit for CF-2026-005897. For the complete demolition of a property as part of the City of Philadelphia Demolition Program. Add'l specs: No sidewa…
EZ Interior Non-Load-Bearing Wall Demo. - - For the interior demolition on NON-Load-Bearing partition walls and ceilings as per attached standard. Alteration/repair is STRICTLY PRO…
Make Safe Permit For RP - MAKE SAFE PERMIT TO COMPLY WITH CF-2023-002771 TO INCLUDE PARTIAL DEMOLITION AND THE REPAIRS/REPLACEMENT OF 2ND FLOOR JOISTS AND FRAMING PER APPROVED PLAN…
installation of construction fence to protect site during full demolition.
installation of construction fence, to protect site during full demolition
Limited interior demolition of finishes and interior partitions. no change in use, egress, or occupancy.