2,835 permits · HVAC · NY
Nycha boiler - plumbing work as per plans filed herewith. no change to use, egress or occupancy.
Installation of the new concrete pads for mech. equipment in tank rooms and boilerroom. create new opening in the exterior masonry walls. new concrete area ways at tank rooms.
Marlboro houses (building #29), the installation of temporary steam and condensate piping to connect (3) temporary boiler trailers to the existing building heating system to provide heat during the he...
Proposed installation of new fire rated wall in cellar for the installation of a new direct vent boiler/water heater combo unit to serve apartment 1r on 1st floor.
Interior renovation of the existing apartment #16e. removal of non-bearing partition, new interior finishes, new ductless air conditioning system. no change in use, occupancy or egress.
Replace oil boiler and burner. installation of four (4) - 330 gal. fuel oil tanks and abandon in-place the existing 5,000 gal. fuel oil tank. no change in use, egress or occupancy.
Air conditioning unit replacement on the second floor MER. No change in use egress and occupancy.
Replace gas burner on existing boiler as per plans filed in conjunction with laa m01342319. no change to use, occupancy or egress.
Abandon buried fuel oil tank and install two (2) 275 gallon fuel oil tanks.
Cap/remove gas connection to eleven (11) gas boilers and replace with three boilers.
Replacement of air conditioning unit for the lobby area. No change in use egress and occupancy.
Filing for pad extension related to boiler replacement/removal per plans filed. no change to use, egress or occupancy.
Filing for pad extension related to boiler replacement/removal per plans filed. no change to use, egress or occupancy.
Filing for pad extension related to boiler replacement/removal per plans filed. no change to use, egress or occupancy.
Renovation of cellar mechanical room - nycha boilers. work includes install new louvers-replace doors & frames-miscellaneous site work, including areaways-replace finishes
Filing for pad extension related to boiler replacement/removal per plans filed. no change to use, egress or occupancy.
Filing for pad extension related to boiler replacement/removal per plans filed. no change to use, egress or occupancy.
Modifications to the existing HVAC System: Relocate ductwork and linear diffusers on the 25-26 and 28th Floors as per plans (DLA Piper Renovations.) No change to use, egress or occupancy.
Construct new elevator building addition. Provide new HVAC units with associated piping and ductwork for new building addition and accessible bathrooms throughout the building.
Filing for pad extension related to boiler replacement/removal per plans filed. no change to use, egress or occupancy.