168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Temporary roof protection at adjoining properties during bldg alteration, filed sep. temporary roof protection shall comply with ch #33 of the nyc bc. no change in use, occupancy o…
Herewith filing reconstruction of rear extension at basement & 1st Floors; new oriel window at 1st floor rear extension. Exterior scope of work includes replacing windows, roof rep…
Removal and replacement of rtu-2 on roof, using existing curbs and roof openings.
Repair of existing facade and replacement of the roof
Installation of sprinklers at the cellar and roof, new 1-1/2 drain riser, and new 4 riser from 11th floor to roof as shown on plans filed herewith. no change in use (u.g.), occupan…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Mount Sinai - Midwood Partial Roof Replacement - Filing for general construction modifications to Roof A and Roof C as per plans filed herewith. No change in use, egress, or occupa…
Facade and roof replacement at the main roof and bulkhead roof as per plans filed herewith. no change to use, egress or occupancy
Direct replacement of a rooftop air conditioning unit on existing steel dunnage.
Application filed for roof replacement at harris hall. this application was previously approved under application # m01059646-i1 but is being refiled as per the job being approved…
Install boiler equipments on bulkhead roof.
Selective Removals and Replacement of Existing Flooring, Cabinetry, Entry Doors, Hardware, Painting, New Chase Wall (1st Fl - 4th Fl), Ceramic Tail Wainscot. New Plant Shelving - A…
Deconstruct and remove existing roofed structure at building storefront to remove violation# 39139288h.
Hvac upgrades throughout building interior and new hvac units on roof.
Removal of existing concrete 2 x 2 roof pavers and support brick resting on existing roof as required to comply with ECB Violation 3457285N. No Change in Occupancy use or Egress.
Installation of a temporary roof protection as per plans during new building construction. no change in use, egress or occupancy. roof protection to comply with 2022 nyc building c…
Structural modifications and framing on floors Cel, 1-12 and Roof as per plans filed herewith. No changes in use, egress or occupancy.
Exterior facade repairs and waterproofing. No change in use, egress or occupancy. Sidewalk shed filed under separate application
Structural framing and reinforcements on floors Cellar, Mez, 1-12 and Roof as per plans filed herewith.
remove exist. rtu-1 on roof & existing air handler above ceillng. on 2nd floor. reuse existing hanger & reconnect duct main supply and install two new multi-split units cu-1 and cu…
Mod. of Verizon site. Remove 6 antennas, 4 RRHs, 1 dist. box, 8 braces, 3 MDBs, & 3 cabinets. Replace 5 antennas, 1 antenna w/2 stacked antennas, 4 RRHs, & 2 dist. boxes. Install 6…