5,433 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Exterior repairs, pointing, brick replacement, waterproofing. No change in use egress or occupancy
General construction for new rooftop amenity on roof and bulkhead
P.S. 244-Q: Structural reinforcement at penetrations required to run ducts for new HVAC rooftop equipment.
P.S. 244-Q: Proposed roof replacement including access landings, new walk pads on the roof. Modifications of concrete curbs and building perimeter sealant.
Starr Roof: roof replacement as indicated on plans filed herewith. No change to use, egress or occupancy.
Filing obtain a C of O to reflect school. The work proposed is a gut renovation of the existing building cellar through the roof as per the plans submitted.
This application filed only to deliver and install photovoltaic arrays and support equipment on roof. all actual construction work performed under application q08032504-i1. solar a…
Starr Roof: Modifications of HVAC equipment and ductwork to accommodate the roof repair project as per plans. no change to use, egress or occupancy.
Repairing the spall and deteriorated concrete and fireproofing.
Rebuild the existing fire, smoke & water damaged two family house, work will include new kitchens & bathrooms at existing roughing, restoration/repair of walls, ceiling and floor f…
Installation of gas piping from cellar to floors 1-9 to bulkhead on the roof.
This application filed only to deliver and install photovoltaic arrays and support equipment on roof. all actual construction work performed under application q08032719-i1. solar a…
Facade repairs to include brick masonry repairs & replacement, lintel repairs & replacement, & main roof and bulkhead roof replacement. no change to use, occupancy oregress.
PROPOSED DEMOLITION OF THE EXISTING CERAMIC TILE FLOORING; OLD CEILING TILES AND GRID TO BE REMOVED AND INSTALL NEW WORK PLATFORM (9'x35') WITH WATERPROOFING OF FLOORING
Emergency temporary shoring installation at the parking garage cellar level to mitigate hazardous roof slab conditions and safeguard public. no change in use, egress or occupancy.
Interior and exterior renovation on the 6th floor, mezzanine, penthouse and roof per plans filed herewith. No change in use, egress or occupancy.
Rooftop solar installation. no change to use, occupancy or egress.
Installation of temporary roof protection netting as per plan. no change in use, egress or occupancy.
Filing herewith tax abatement application for installation of roof mounted solar panels. no change in use, egress or occupancy.
Installation of roof protection as per plans. no change in use occupancy or egress under this application.