17,425 permits matching "roofing"
Cooling & heating spaces w/wall mounted, ductable split units & provide new air terminals. Install Heat Pumps, VRF units, refrigerant piping, ductwork, supply/return registers, bath/shower fans, goose...
Existing garage to repair deteriorated walls and roof to restore to existing conditions,
TILE ROOF
Condo re-roof
Re-roof flat
Instal 575.960 kw/dc roof mounted solar array consisting of 968 panels with associated equipment
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Installation of 300psf sidewalk shed, roof protection and pipe scaffolding as per plans. all equipment shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this a...
Conversion of multi family to single family residence, revisions to stairs, partitions, kitchen, bathrooms and interior finishes. new roof framing, new stair bulkhead.
New detached wood frame garage. dimensions and setbacks per application. building outside dimensions: 20'-0' ' x28'-0' '. gable roof height to peak: 9'-0' '.
Existing garage to repair deteriorated walls and roof to restore to existing conditions,
Self-cert 2019 crbc - cps school - no change in use james n. thorp elementary school roof replacement & mep improvements at existing two-story brick school building
Installation of solar panels on existing roof. no change in use, occupancy, or egress. no change in bulk. work is being paid for under job # x01208892-i1
Spr 2019 cbrc: 1416 sf addition with basement to existing 2317 sf 2-story plus basement 1 dwelling unit single family house. new windows in existing openings. partial roof replacement. new deck and co...
Plumbing Work for Roof
Filing herewith tax abatement application for installation of roof mounted solar panels. no change in use, egress or occupancy.
Interior renovation of 1 family brownstone at basement, 001, 002 and roof. minor structural work as per plans. no change in use, bulk, occupancy or egress.
Replacement of sheetrock throughout the cellar, first, and second floor. install the new dunage on the roof for the condensing units. there will be no change in use, occupancy, or egress.
Installation of photovoltaic solar array on existing roof system as per plans
Installation of 300psf sidewalk shed, roof protection and pipe scaffolding as per plans. all equipment shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this a...
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com