9,542 permits · New Construction
Fire alarm: new system. associated building permit:101040471. affects: 0 dwelling units; 2 non-residential units. high-rise building: no. voice communication: no. special locking: no. monitoring type:...
Fire alarm: new system. associated building permit:101076960. affects: 0 dwelling units; 1 non-residential units. high-rise building: no. voice communication: no. special locking: no. monitoring type:...
Self cert 2019 cbc: full building permit for new single family residence (occupancy group r-5, type v-a construction), (basement + 1st floor + 2nd floor)new composite wood front porch and block stairn...
Heavy duty sidewalk shed during nb filed under application # m00951254, filed sep. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application
Filed herewith a Temporary Standpipe for a new building. Standpipe as per NFPA 14, as modified by BC Appendix Q.
new 3-story SFR 6 bed 5 bath with attached garage front covered porch and rear covered patio
New first-time tenant finish out of existing empty vanilla shell to new First Watch Breakfast Brunch and Lunch restaurant
SOE in conjunction with NB
ePlan: Residential Expedited Review - Addition and Remodel to Existing 2-Story Single Family Res. [3bed 3bath] Work to include: Second Floor balcony conversion New bed New bath [4bed 4bath]
ePlan Review: New construction of 30 story hotel Shell with basement and mech penthouse and restaurant (36 applications)
Structural Application is filed for investigative wall probes at 201 East Broadway to verify existing conditions of work completed under expired NB App. 122557928. Probes are limited to the new concre...
Residential New Construction, Olde Towne Lot 39
New construction, addition, GFA change - FOR THE ERECTION OF AN ATTACHED STRUCTURE WITH CELLAR AND EIGHT FEET FRONT SETBACK ABOVE 2ND FLOOR. SIZE AND LOCATION AS SHOWN IN THE APPLICATION / PLAN.
INTERIOR DEMO/REMODEL. CANNABIS DISPENSARY. NO STRUCTURAL WORK. CHANGE OF OCCUPANCY. NO WORK IN BASEMENT. ANY STRUCTURAL WORK WILL REQUIRE A NEW BUILDING PERMIT AND DRAWINGS STAMPED BY A LICENSED ENGI...
New Construction - FOR NEW CONSTRUCTION OF AN ATTACHED BUILDING WITH CELLAR PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED WITH NFPA 13. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLU...
New Construction - FOR THE ERECTION OF A TWO (2) STORY DETACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT, ONE (1) INTERIOR PARKING SPACE, AND ONE (1) EXTERIOR SURFACE PARKING. FOR USE...
New Construction - FOR INSTALLATION OF A TWO-INCH FIRE SERVICE LINE, TWO-INCH BACKFLOW PREVENTER AND FIRE SPRINKLER SYSTEM IN ACCORDANCE WITH APPROVED PLANS, HYDRAULIC CALCULATIONS AND NFPA 13.
New Construction - FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS THREE DWELLING UNITS AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLER PER NFPA 13. SEPARATE PERMITS REQUIRED FOR MEP & FP W...
New Construction - FOR THE ERECTION OF A TWO (2) STORY DETACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT, ONE (1) INTERIOR PARKING SPACE, AND ONE (1) EXTERIOR SURFACE PARKING. FOR USE...
New Construction - COMBINED AUTOMATIC SPRINKLER & CLASS I MANUAL WET STANDPIPE SYSTEMS WITH TWO (2) INCH FIRE SERVICE LINE & BACKFLOW PREVENTION (BFP) ASSEMBLY TO SERVE PREVIOUSLY APPROVED MULTI-FAMIL...
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com