3,978 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Construction fence filed in conjunction with demolition of 3 homes (x01263918, x01263923, x01202831, x01202829).
Standard-Demolition:2252/Kearny - SOUTHEASTERN SAN DIEGO; Demolition/Removal Permit for the proposed demolition of (1) 586 square-foot, 2-bedroom SDU, and (1) 834 square-foot, 2-be…
installation of construction fence to protect site, during full demolition
installation of construction fence, to protect site during full demolition
installation of construction fence to protect site, during full demolition
Interior demolition and installation of new partitions and finishes on partial 6th floor in the existing office building as per plans filed herewith only. No change to zoning, use,…
installation of construction fence to protect site during full demolition.
Demo 1 story masonry building
Standard-Demolition:2252/Kearny - SOUTHEASTERN SAN DIEGO; Demolition/Removal Permit for the proposed demolition of (1) 586 square-foot, 2-bedroom SDU, and (1) 834 square-foot, 2-be…
Emergency stabilization of penthouse structure. work includes partial demolition of penthouse structure, stabilization and capping of parapet wall to repair leaking into unit below…
Interior alterations for new tenant office space. work includes selective demolition, new walls, ceiling panels, doors & hardware, casework and finishes.
Limited interior demolition of finishes and interior partitions. no change in use, egress, or occupancy.
Demo of two story dwelling
full demolition of 22 story structure using hand held and mechanical equipment to assist.
Structural application filed for partial demolition and shoring work to remedy dangerous conditions due to partial collapse. No change to use, egress or occupancy.
DEMOLITION
Interior demolition of non load bearing partitions on the 10th floor (part of northside suite) as indicated on drawings.
Installation of temporary 8' tall construction fence to remain during the Demolition and New Building phases of work. No change to use, egress or occupancy.
Hand demolition of existing garage
Full demolition of the existing 1-story building