168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Demolition of existing vavs, ductwork and piping serving existing space. installation of new variable refrigerant system to servenew space consisting of outside air units for venti…
Installation of mechanical system
Modifications to the Mechanical systems on the 2nd floor as per plans submitted herewith. No Change to Use, Occupancy or Egress.
Application filed to install kitchen exhaust system (hood,ductwork and exhaust fan) for existing commercial space at firstfloor as per plans. fire suppression system filed separate…
Installation of temporary needle beam as per plans. no change in use, egress or occupancy shall comply with chapter#33 of 2022 the ny building code.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Demolish ex building down to foundation. rebuild & vertically enlage building for 4-story, 3-family building on existing foundation. reinfoce existing cellar. related structural, m…
Equipment use: installation of dual 7000# capacity personnel hoists during new bldg const. filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or…
Mechanical work in conjunction with proposed 7 story and cellar mixed use new building.
Ch/ps155m for temporary construction equipment(chute) submitting on behalf of contractor, related with dob #m00951319 no change in use, occupancy or egress
Temporary hoist run-back structure during bldg construction, filed separately. hoist run-back structure shall comply with ch #33 of the nyc bldg code. no change in use, occupancy o…
Installation of temporary debris chute as per plans. no change in use, egress or occupancy.
Equipment use: single 7000 # capacity personnel hoist during bldg const, filed sep. hoist shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this a…
Modifications to the existing HVAC system on the Sub-Cellar level 4, 10th & 11th floors (Apollo Global Management) as per plans. No change to use, egress or occupancy.
Minor alternation at kitchen of existing assisted living home, install new kitchen appliances at the same location, replace kitchen hoods & ductwork, modifying existing gas pipings…
Installation of temporary overhead protection for worker safety during construction. Temporary overhead protection shall comply with NYC BC Chapter 33. No change in use, egress, or…
Herewith filing mechanical work as per plans. no change in use, egress or occupancy
Provide new sprinklers for alterated commercial space as per plans filed herewith. no change in use, egress, or occupancy. filed in conjunction with altco# m01330260, plumbing# m01…
NYCHA Sumner BOILER-BLDG #12- Mechanical Work filed for Replacement of existing vacuum pump & connections, control valve & by-pass valve system. Removal of steam piping to existing…
Mechanical work in conjunction with renovation of 5-story nycha multiple dwelling throughout: installation of new air-conditioning systems, ventilation systems and miscellanceous h…
Mechanical work in conjunction with renovation of 6-story nycha multiple dwelling throughout: installation of new air-conditioning systems, ventilation systems and miscellanceous h…