168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Removal and Replacement of two exterior doors. No change in size or location.
Add small powder room in basement. Addendum to previous permit application (BLDG1163002). Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 Fuel-fired ap…
Vinyl Siding First and Second Floor- House Only
Replacing 7 windows- No changes to rough openings
Replacing 12 windows- No changes to rough openings
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Complete the following stucco work on house; -Apply 2-layers grade D moisture barrier, lath, scratch, brown and finish coat on north wall where stucco was removed on 1st and 2nd fl…
Demo existing shower to install new tub/shower and surround at existing approx. 5'x7' basement bathroom. 6'-4'' min. finished headroom clearance must be provided in basement bathro…
Install 11.87sq of Hardie siding.
Construct/replace stoop and steps on front of existing sfd. minimum landing size 36" by 36" hand rail must be 34" to 38" above nosing of treads (required if 4 or more risers) 7 3/4…
(dmh-pdox) remove center bearing wall in detached garage and install new lvl center bearing beam. install new overhead door headers and foundation wall reinforcing per engineer dra…
Replace 18 windows within existing openings.
Replace rear deck boards, railings, and stairs Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 Stairs: 7 3/4 maximum riser height, 10 minimum tread dep…
Parking ramp repairs. phase 3 only. (jjl) type ia construction engineer: walker consulting - michael retterath #44637 special inspections: braun
Remodel portions of existing offices and Tech Bay -ACW certificate of occupancy required: no special inspections required: no const type: II-B occupancy: B, F-1 2020 MSBC sprinkler…
Remodel existing main floor bathroom and create new 5'x10' bathroom in unfinished basement at sfd. 6'-4'' min. finished headroom clearance must be provided in basement bathrooms an…
Replacing 1 window, like for like
Completing code compliance project based upon the scope of the building code orders dated February 7, 2025. The starting point for this building permit will be the required inspect…
#1400 interior demo - patch finishes and lighting.
Replace one existing window with non-egress window with flushed header and new window well on north elevation wall in existing basement floor of a single family house. aaj (project…
Replacing 3 windows