5,433 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
P.S. 244-Q: Structural reinforcement at penetrations required to run ducts for new HVAC rooftop equipment.
Starr Roof: Modifications of HVAC equipment and ductwork to accommodate the roof repair project as per plans. no change to use, egress or occupancy.
Starr Roof: roof replacement as indicated on plans filed herewith. No change to use, egress or occupancy.
Proposed renovation of an existing commercial space with mechanical work as per plan, work at first floor & roof. no change in use, egress, or occupancy.
Installation of solar panels, rooftop, grid tied, railed, 14 modules, 5.74 KW
This application filed only to deliver and install photovoltaic arrays and support equipment on roof. all actual construction work performed under application q08032719-i1. solar a…
Installation of temporary overhead/ roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this a…
Installation of photovoltaic solar array on existing roof system as per plans.
Remove and reinstall of air-cooled condensing unis on roof and first floor, evacuate and extend refrigerant piping, power, control wiring and etc.
Exterior facade repairs and waterproofing. Pointing, brick replacement, parapet repairs, waterproofing,
Demolition taking place on the 1st, mezz, 2nd, and 3rd floors and on the roof as per plans filed herewith. no change in use, egress, or occupancy.
installation of solar panels, rooftop, railed, grid-tied, 32 modules, 13.12kw
Filing herewith tax abatement application for installation of roof mounted solar panels. no change in use, egress or occupancy.
Installation of solar panels, rooftop, railed, grid-tied, 14 modules, 6.09kw
Providing roofing replacement, parapet replacement including 14th floor exterior facade work from 14th floor lintel to roof level and rooftop structure repairs and entrance canopy…
Installation of (1) 20 ton air cooled packaged rooftop system and (1) 3 1/2 ton air cooled package rooftop system on 1st floor roof.
Installation of new bathroom fixtures & hot water heater as per the draiwngs filed herein. new gas-fired rooftop hvac units as per ms application #b01122409-s2. no change in use oc…
INSTALLTION OF NEW HEAT PUMP UNITS ON ROOFTOP LEVEL and replace 3 gravity ventilators.
New store front assembly at building entrance and terraces, new windows, replacement of all main and bulkhead roofs.
Install new mini-split system at first floor commercial space and on second floor at apt. 2 and apt. 3. condenser for the commercial space at exterior wall and for apartments on ro…