17,354 permits matching "roofing"
Sprinkler system alterations on the 1st thru 3rd floors, cellar, mezzanine, and roof levels in conjunction with full building renovation; related work as per plans.
Replace roof membrane at approximately 100 square feet.
To file ms worktype for a new split unit at the 3rd floor roof and 1st fl. retail. no change in use, egress, or occupancy under this application.
Installation of photovoltaic solar array on existing roof system as per plans
Installation of photovoltaic solar array on existing roof system as per plans
Mechanical work to renovate units #1b, 1d, 2a, 2b, 2c, 2d,3a, 3b, 3c & 3d from cellar to roof, no change to use, egress or occupancy.
Filing herewith tax abatement application for installation of roof mounted solar panels. no change in use, egress or occupancy.
Filing herewith tax abatement application for installation of roof mounted solar panels. no change in use, egress or occupancy.
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
New HVAC units on roof and associated ducts and piping on first floor and cellar.
Installation of solar panels on roof. no change in use, egress, or occupancy.
General construction on the cellar, 1st to 4th floor and roof as plans filed herewith. no change in use, egress, or occupancy.
New detached wood frame garage. dimensions and setbacks per application. building outside dimensions: 20'-0' ' x20'-0' '. hip roof height to peak: 13'-0' '.
Installation of solar panels on existing roof structure. no change in egress,use, or occupancy.
Installation of PV solar on existing roof no change to egress or use of occupancy
Remove and replace gravity exhaust /re-install roof ventilators and exhaust fans. Remove and replace louvers.
Installation of solar panels on roof. no change in use, egress, or occupancy.
Filing herewith tax abatement application for installation of roof mounted solar panels. no change in use, egress or occupancy.
Miscellaneous facade and roof restoration as per plans. no change in use, egress or occupancy.
MISCELLANEOUS FACADE & ROOF RESTORATION (floors 1-6), AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.