22,504 permits · Other · NY
Structural specifications filed in conjunction with gc application job x01171954-i1
Fence as shown on plans in conjunction with ALT CO application #: B01213386-I1 and subsequent filings.
Structural reinforcement for ATM as shown in the drawings filed herewith.
temp wood construction fence
Structural work associated with vertical/horizontal enlargement of existing building.
8' high plywood construction fence
Installation of structural work involved in partial demo as per the plans filed herewith. no change in use, occupancy or egress.
Filing for construction fence
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Installation of a temporary construction fence in conjunction with gc application #q00928662-i1 to resolve ecb violation #39528614n.
Installation of IRA during facade inspection.
Temporary construction fence in conjunction with alt i application #b01350097-i1
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Foundation
Installation of temporary chain link fence as per plans. chain link fence shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application.
6th FLOOR MER-- Modifications to existing sprinkler system, add sprinkler piping and new heads as per plans filed.
Scaffold equipment to assist with foundation with foundation construction work
Sprinkler modifications as per plans filed herewith. No change to use, egress or occupancy.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Structural Work as shown on plans submitted herewith. No change to use, egress or occupancy as of right.