13,622 permits · HVAC
ePlan: Residential Expedited Review - New construction of a 1-Story Single Family Res. [1bed 1bath]. BLDG 2
Mechanical work as per plans
Modifications to existing Mechanical System as per plans filed herewith. No change in use, egress or occupancy. Work to include new air outlets, re-balancing, and new transfer ducts.
hereby filing to install new ac units with associated ductwork and piping as shown on plans filed herewith. No change to use, occupancy or egress.
Application filed for mechanical modifications/additions on the 2nd floor as per plans filed herewith. no change in use, egress or occupancy
Conversion of attached carport into an office.
Mechanical work filed in conjunction with the architecture application: replace existing exhaust fans with new, demo and removal of existing fuel oil, steam and consensate piping system throughot the...
Installation of Fuel Storage tanks for a diesel-based emergency generator.
Ps 128m, installation of temporary chimney, steam, condensate, and make-up water piping to connect temporary mobile boiler and provide heat to the building. no change in use, egress, or occupancy.
Renovation of cellar mechanical room - nycha boilers replacement. work to include: install new louvers-replace doors & frames-miscellaneous site work, including areaways-replace finishes.
Installation of the new concrete pads for mech. equipment in tank rooms and boiler room.create new opening in the exterior masonry walls. ew concrete area ways at tank rooms.
New 3-story townhouse condominium residential building with three units. Unit 108 with (2) bedrooms (2.5) bathrooms attached garage attached carport storage room attic and covered patios.
Replacement of complete existing central heat and air system with or without duct work
Application filed for installation of residential heating and cooling split systems and mechanical ventilation as per plans filed herewith.
Removal existing one(1) pneumatic thermostat, associated tubing, new steam traps, valves piping and controls, install (1) new VRF/ACCU-Unit, (1) New Energy Recovery Ventilator (ERV) New sheet metal, d...
Installation of mechanical system for the 3rd and 4th floor level. no change in use, egress or occupancy.
Q520_Provide wall openings for duct work penetration. Remove/replace ceilings, grilles. Remove/replace and store/reinstall light fixtures. Provide temporary fire-rated partitions and doors for corrido...
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [5bed 4bath] with Attached Garage.
ePlan: Residential Expedited Review - Unit 2B Bldg 2. New construction of a 2-Story Duplex unit [3 bed 3 bath]. Part of 3-unit use w/ existing residence to remain.
2708al new 2 story 5 bedroom 3 bath single family residential home with attached garage covered front porch and rear patio
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com