168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Propose removals of existing, baseboard, hydronic heating supply and return, and boilers and associated piping. Install condensate pumps, PTHP, dehumidifier and electric heater as…
Modification of existing boiler as shown on plans
New ductwork for existing fan coil unit, new split system heat pump, 2 toilet exhaust fans & ductwork
Renovation.installation of mitsubishi vrf heat pump system with heat recovery. this includes 7 air handling units, 1 branch box controller, and 1condensing unit on the 12th floor,…
Minor low pressure ductwork modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
New ductwork in conjunction with interior alterations filed in gc application q01328673-i1. exist'g rtu to remain.
Modification of existing openings for mechanical equipment; replace window with new insulated panel, & restore upper sash of window, as per plans filed herewith. No change in use,…
Herewith filing the installation of a Fuel Storage Tank for a diesel-based Emergency Generator as per plans. Emergency Generator was filed under App. X08018782-S1.
Equipment use: single 7000 # capacity personnel hoist during bldg const, filed sep. hoist shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this a…
Hereby filing for mechanical work related to alteration type 1 # b00893028-i1
Mechanical work in conjunction with renovation of 5-story nycha multiple dwelling throughout: installation of new air-conditioning systems, ventilation systems and miscellanceous h…
Mechanical work in conjunction with renovation of 6-story nycha multiple dwelling throughout: installation of new air-conditioning systems, ventilation systems and miscellanceous h…
Application filed for mechanical additions/modifications on the 1st floor as per plans filed herewith. no change in use, egress, or occupancy.
Installation of single material hoist in accordance with nycc 2022 chapter 33 building code. change in egress, use, or occupancy.
Mechanical work in conjunction with renovation of 5-story nycha multiple dwelling throughout:installation of new air-conditioning systems, ventilation systems and miscellanceous hv…
Structural work - framing for new mechanical shaft enclosure, a new dunnage platform, and mechanical openings in existing load-bearing masonry walls. no change in use, egress, or o…
Mechanical modifications as indicated on plans. no change in use, egress or occupancy.
Installation of fuel storage tank. Generator filed under application Q01241979-l1.
File mechanical work type to install (5) new split condenser units on front & rear yard and remedy ecb violation #039165401j.no change of use, egress or occupancy
Modifications to the existing HVAC system on the Sub-Cellar level 4, 10th & 11th floors (Apollo Global Management) as per plans. No change to use, egress or occupancy.