10,267 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
1ST
Plumbing modifications to the plumbing fixtures in units 7C and 10C. NO CHANGE TO USE EGRESS OR OCCUPANCY.
The plumbing scope of work includes replacement of exist. plumb. fixtures on existing roughing for the apt. 4f as per plan - (2) wc, (2) lav, (1) ks, (1) bt. installation of new pl…
Modifications to the existing plumbing fixtures and sprinkler system as per plans filed herewith. No change to use, egress, or occupancy.
Partial interior alteration of an existing single-family duplex unit with plumbing work. two new plumbing fixtures for the new powder room on the first floor. no change in use, occ…
Mount sinai - ccsi atran basement - plumbing modifications as per plans filed herewith. no change in use, egress, or occupancy.
Filing herewith plumbing installations, additions, and modifications, including but not limited to water piping, RPZs, electric hot water heaters, pumps, fixtures, etc. as per plan…
Plumbing work as shown on plans filed herewith. No change to use, egress or occupancy.
Plumbing work in apt 2 filed in conjunction with dob now gc. no change to use, occuapncy or egress.
Application herewith filed for all plumbing and gas work in conjunction with CO application.
Removal & relocation of existing plumbing fixtures. New installation of plumbing fixtures & associated rough piping. No change in use, occupancy or egress.
Plumbing work in association with primary mechanical filing s01371774-i1. no change to egress, use, or occupancy.
Plumbing work associated with renovation of existing commercial space for 'softville' as per plans filed herewith. no change in use, egress or occupancy.
New installation of water and sanitary NB
Plumbing work as shown on the plans.
Plumbing & sprinkler modifications as per plans filed herewith. No change to use, egress, or occupancy.
File plumbing work of existing 2-story residential building to replace gas meter and obtain gas authorization. no change in use, egress or occupancy.
Renovation of an existing retail space on 1st floor of an existing building. install new plumbing fixtures. no change in use, egress, or occupancy in conjunction w/ initial g.c app…
Plumbing application filed in conjunction with gc to legalize work without permit. remove cellar partition and legalize 2 fixture bathroom in cellar.
The Alteration application is being filed for the plumbing work for the installation of new water connection with the RPZ backflow Preventer at the subject premises as per plans su…