11,038 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Application is filed for interior removal of non-loadbearing partitions, ceilings, flooring and finishes onfloors 2 - 6 of existing building as per plans submitted.there will be no…
Filing herewith sprinkler and standpipe installations, additions, and modifications to existing system as per plans.
Filing herewith sprinkler and standpipe installations, additions, and modifications to existing system as per plans.
Proposed minor duplex extension on existing 2 story & basement 3 apartments building, adding a minor duplex to 2nd floor apartment, building will stay as a 3 family, proposed new c…
Removing partition walls and new partition walls in cellar. removing and new doors in cellar, new egress staircase from cellar to outdoors. no change in use, egress, occupancy or b…
Removal/install of non-load bearing partitions, fixtures and finishes in cel, 001-003 and rof for existing nycct environmental (e) bldg. no change in use, egress or occupancy.
minor non load partition wall and door in apt#11E. no change in use, egress or occupancy.
New 5 story addition with elevator & bathrooms, new exterior ramp, convert existing classrooms for accessibility & ARA rooms, renovate medical suite 3 floor with ADA bathroom, repl…
Claremont Bldg 4, Exterior Retaining Wall Reconstruction: Excavation/Placement/Compaction of existing landscaping, paving, backfill/soil fill and overburden/fill behind existing re…
Interior demo & reno of non-load bearing partitions, walls, doors, ceiling & finishes as indicated on plans,
Interior removals work on the 55m/54c - 56m/55c floors to include partition, ceiling, and door removals as per plans. no change of use, egress or occupancy.
Provide interior partitions & doors. Modify existing stairs to the existing cellar. Modify bathroom fixtures in (1) existing bathroom and provide (1) full bathroom. Relocate (1) ex…
Addition and modification to exsiting sprinkler system as shown herewith. no changes to egress, occupancy or use
Herewith filing for interior modifications in units 7c & 10c as per plans. no change to use occupancy or egress.
Minor interior partition changes as per plans. no change to use, egress or occupancy filed under this application.
Interior fit-out for nail salon & cellar storage. scope: new non-structural partitions. no change to use, egress, or occupancy.
Filing an alt application for adding a second story to a one family detached residence. no change in use and no additional lot coverage is being added under this application
Interior renovation, partition work
Facade repairs as per plans. No change to use, egress or occupancy.
Exterior masonry repairs. no change in use, occupancy or egress under this application.