13,742 permits · HVAC
Mechanical specifications filed in conjunction with gc application b01190376-i1
SOE work to be conducted.
Installation of new furnace and air conditioning system.
Erect new non-bearing gypsum board demising partition withing single existing bedroom to create two bedrooms. exyend existing ductwork to new bedroom. no change in use, egress or occupancy under this...
Actively Managed-Express-Building Construction:201/A - SCOPE CHANGE (11/06/2025) DOWNTOWN: Building, Mechanical, Electrical and Plumbing permits for a new Whole Foods tenant improvement located on the...
Modifications to existing 7th floor mechanical systems. no change to use, occupancy or egress
Mechanical modifications to the 6th floor as per plans filed herewith. No change in use, egress, or occupancy.
1) installation of new split system heat pumps for heating and cooling of each residence. 2) installation of exhaust and erv systems for ventilation of each residence.
A/c legalization
mh work on the 11th floor (12th floor marketing) remove existing outdoor condenser & indoor ahus w/ducts. install new hvac. install new indoor units on existing slab. install outdoor condenser on setb...
Installation of a new boiler
Install new HVAC.
Addition and alteration of one family house to install new plumbing fixtures and related piping as per floor plan.Existing gas fired hot water heater and boiler will be removed.Existing wall mounted s...
Minor modifications of the existing HVAC system and associated ducts & piping on the 34th Floor (Cohen Clair), as per plans. No change to use, egress, or occupancy.
Install three (3) replacement chimneys for one (1) replacement gas-fired boiler and two (2) existing boilers as per plans. no change in use, egress or occupancy.
RENOVATION OF EXISTING CELLAR AND 1st FLOOR WITH PLUMBING WORK: REPLACE KITCHEN AND BATHROOM FIXTURES; NEW 2-PC RESTROOM, WASHER, DRYER, BOILER AND HOT WATER HEATER IN CELLAR; NO CHANGE IN USE, EGRESS...
Application filed to replace existing hvac equipment as per plans filed herewith.no change in existing ductwork or air terminals.
Relocation and redistribution of existing HVAC and bathroom exhaust systems as per plans filed herewith. No change in use, egress, or occupancy.
Mechanical modifications to include hvac replacement and replacement of associated ductwork. no change to use, egress or occupancy.
Herewith filing modification to existing mechanical ductwork/piping in conjunction with Alt-Co to establish new place of assembly. Refer to Associated Application M01337402-S2 For Mechanical Equipment...
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com