17,285 permits matching "roofing"
Roofing
Tear-Off existing shingles (house only) and install new shingles on roof. 1 structure.
reroofing: install 60 mil tpo membrane system over (e) modified bitumen built up roof, approx. 1000 sq ft. install new certainteed asphalt shingles to replace (e) on mansard, approx. 300 sq ft. no hot...
revision to 202410082572: to now included dormers in attic space within e) roof, a new attic powder rm, new attic utility sink & dishwasher, new laundry sink, a new handrail to replace the e) on the i...
INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING.(MAA) COLLECTOR CAPACITY _10.32___ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1100 Subp.5a as applicable. ADDITIONAL PERMIT...
solar permit: installing 8 solar pv modules, 410 watts per module, total no. of rating 3.28 kw. mounted: roof, ballasted: n, including 1 energy storage unit, of 240 vac, with 15 kwh in capacity.
Make Safe Permit For RP - MAKE SAFE PERMIT TO COMPLY WITH UNSAFE VIOLATION CF-2024-124827 TO INCLUDE STRUCTURAL REPAIRS TO ROOF AND FLOOR FRAMING PER APPROVED PLANS, ENGINEERS REPORT AND IN ACCORDANCE...
EZ Roof Covering Replacement - For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the at...
EZ Roof Covering Replacement - For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the at...
EZ Roof Covering Replacement - For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the at...
EZ Roof Covering Replacement - For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the at...
EZ Roof Covering Replacement - For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the at...
Installation of photovoltaic solar array on existing roof system as per plans.
repair and replace existing ac dunnage on portion of roof. No change to use, egress or occupancy under this application
replacing of hung ceilings in portion of first floor and mech penthouse to accommodate new ductwork layout and new lights. Replacement of a portion of roof for installation of new ac condensers. Minor...
Installation of temporary roof protection as per plans. temporary protection shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of photovoltaic solar array on existing roof system as per plans
Structural work filed in conjunction with alteration application for renovation of an existing penthouse. Work is limited to designing a roof opening and supporting a new stair.
Alum insult roof
RE ROOF