13,740 permits · HVAC
Mechanical work on 15th fl, no change in use egress or occupancy
Application filed for mechanical additions/modifications on the 4th floor as per plans filed herewith. no change in use, egress, or occupancy.
Herewith filing modification to existing mechanical ductwork/piping in conjunction with Alt-Co to establish new place of assembly. Refer to Associated Application M01337402-S2 For Mechanical Equipment...
eplan Supplemental to 25014-10000-02454 REVISIONS TO HVAC TYPE FROM CENTRAL TO MINI SPLIT AND TITLE 24. STRUCTURAL CHANGES TO THE FOUNDATION
New construction of a 2-story single family dwelling in a condo regime. 3 BEDROOM 2.5 BATH ATTACHED GARAGE
New vertical & horizontal enlargement to existing 2 1/2 story 1-family building. interior gut renovation at cellar, first, second and attic floor. new partitions, windows & finishes, hvac as per plans
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Interior Remodel to existing 2 story structure. [7 Day Review]
Replacement of complete existing central heat and air system with or without duct work Installing 2 Ton 15 Seer Upflow Gas System.
Replacement of complete existing central heat and air system with or without duct work 1 system: 4 ton - 14.3 seer - heat pump system
Hvac filing for 2-family residential house
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3.5 Ton Horizontal Gas System
New construction single-family residential 2-story 4 bedroom 3 bath with attached 2-car garage covered front porch and covered rear patio.
Interior remodel to existing restaurant with dining room addition.
Replacement of complete existing central heat and air system with or without duct work
Addition/ interior remodel of existing 2-story single-family residential to include: enclosing existing screened porch to extend kitchen; IR of kitchen and utility room.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work 3 ton hvac replacement
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com