Search Building Permits
2,077 permits · Demolition · NY
General construction work consisting of inter demolition and construction as per the plans filed herewith. no change to use, egress or occupancy.
Full demolition of a 3 story building. using hand held equipment and mechanical means to remove foundations, load out debris and back-fill.
Minor demolition with installation of new partitions, doors, ceilings and finishes on the 18th floor (Derby Lane) as per plans. No change to use, egress or occupancy.
Renovation at 3rd floor apartment including minor demolition and partition construction.
Interior renovation of apt. 28e with minor demolition. remove & relocate non load bearing partitions per plans. no change in egress, occupancy or use is involved under this application.
Filing Plans for, sequence, means and method for the proposed partial demolition of existing 5 story buildings, in conjunction with Alt I # 121188320
General construction and partial demolition of the Rockefeller Research Lab (Pavilion Enabling) parking garage as per plans filed herewith. No change in use or occupancy under this application. Existi...
Structural modifications associated with Rockefeller Research Lab (Pavilion Enabling) Parking Garage alteration. Scope to include, but not limited to, partial demolition, reinforced concrete, structur...
Full demolition to a one story building
Fully demolition of existing one story garage
Non-structural interior demolition at existing 10th floor office space. remove existing floor finishes and non-load-bearing partitions. no change in use, egress, or occupancy.
Demolition and general construction on retail on 1st and 2nd floors as per plans. No change to use, egress or occupancy.
Full demolition of existing two story two family dwelling.
full demolition of two story structure using hand held and mechanical equipment to assist.
Full demolition of house via hand means
Structural modifications associated with Rockefeller Research Lab (Pavilion Enabling) Parking Garage alteration. Scope to include, but not limited to, partial demolition, reinforced concrete, structur...
Full demolition to a one story building
Filing Plans for, sequence, means and method for the proposed partial demolition of existing 5 story buildings, in conjunction with Alt I # 121188320
Demolition and general construction work on partial 25th floor as per plans. No change to use. egress or occupancy.
Full demolition of existing two story two family dwelling.