168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Fire Protection modifications on 8th Floor as shown on plans filed herewith. No change in egress, occupancy, or use.
Fire Protection modifications on 8th Floor as shown on plans filed herewith. No change in egress, occupancy, or use.
Renovation and MEP improvements of 6 story building. Work to include new accessible entrance, fire alarm, gas generator with associated electrical service, and new layout and finis…
Interior renovation of apartment #3b/4b on the 3rd/4th floor. scope to include bathrooms, kitchen, and complete remodel. all new branch electrical, plumbing, and wastelines. no cha…
Filing to legalize existing conditions. on 3rd floor, removal of kitchen cabinets, counter, sink and electric stove. legalize existing partitions, doors and 3 piece bathroom. no ch…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Install new fire sprinkler system in the entire building i.a.w. nfpa 13d 2016 edit, as modified by nyc bc 2022 appendix q as per plan, in conjunction w/ nyc dob now job#: b07995963…
Interior work for apt b1/b2. the work includes the renovation of two bathrooms and a kitchen. also, the floors will be new, all walls to be patched and painted, new lighting andele…
Installation of new electrical vault(manhole). no change in use, egress or occupancy
Installation of new electrical vault(manhole). no change in use, egress or occupancy
Disconnect & remove all fa devices & wiring associated with tcu removal back to the source.
Provide new fire sprinkler system throughout 4-story, 7 family building with cellar, penthouse & bulkhead, in conjunction with alt-1 #q01201924
Installation of system scaffold tower from first floor to 8th floor to provide a working platform during the installation of the new electric conduits in the shaft in conjunction w…
Excavation for the removal and replacement of an existing electrical manhole
Installation of new combined water service with bfpa and fire sprinkler system
HUB consultation accepted on 5/9/2024. Alteration within 72 units and common areas and exterior facade. Removal of non-load bearing walls. Replacement of fixtures, doors, partition…
Convert existing paved clothes drying area to voluntary ev charging parking space in accordance w/ 2022 nyc building codes and con-edison electric vehicle charging programs. no cha…
HUB consultation accepted on 5/9/2024. Alteration within 72 units and common areas and exterior facade. Removal of non-load bearing walls. Replacement of fixtures, doors, partition…
To legalize existent metal awning, 1554 life center 1554 electrical work filed under another application. no change in use, egress or occupancy
To legalize existent metal awning, 1556 sanctuary 1556 electrical work filed under another application. no change in use, egress or occupancy
1.corridor renovation (3rd to 6th floors only) due to electrical repair work. floor framing repair at public bathrooms (3rd to 6th floors only)