Search Building Permits
7,089 permits · HVAC
Installation of 2 air conditioners-Stand Alone
Minor alteration
Install new A/C system
1) installation of gas furnaces with split system dx coils for heating and cooling. 2) installation of exhaust and erv systems for ventilation.
HVAC
Jacobi Medical Center proposed Mechanical-HVAC work interior renovation of an MRI on 3rd and 4th Floor. No change in use, egress or occupancy. All as per plans filed herewith.
Installation of Mechanical HVAC system including heating and cooling equipment, ventilation duct work & fans, and mechanical piping in conjunction with job# B00989327-I1
New air conditioning and ventilation installation for apartment renovation in conjunction with GC #M01084668-I1. No change to use, egress, or occupancy. Post Approval Amendment filed to show changes t...
1) installation of gas furnaces with split system dx coils for heating and cooling. 2) installation of exhaust and erv systems for ventilation.
1) installation of gas furnaces with split system dx coils for heating and cooling. 2) installation of exhaust and erv systems for ventilation.
replace existing ducts with new layout on existing existing HVAC system on portion of the 10 floor in conjunction with Alt # M01349165 as per plans filed
Modifications to the existing HVAC system and associated ducts and piping on the 32nd Floor (EQT), as per plans. No change to use, egress, or occupancy.
Modifying ductwork & supply diffuser to accommodate new partition layout, Demolition of existing AC systems & ductwork .Adding air conditioning units to the 2nd floor to supplement the removed systems...
Installation of new boiler as per plans filed. No change in occupancy, use or egress.
HVAC tenant fit-out including installation and replacement of air conditioning and ventilation equipment, associated ductwork and piping, and related controls within the existing ground-floor tenant s...
Reach 7 - Temporary relocation of the HVAC system. Once construction of the proposed area is done, HVAC will be restored back to its original location. No change to use, egress or occupancy.
Repair gas lines and proposed ceiling mounted gas furnaces.
Construct tenant improvements in commercial building on fourth floor occupy per plan. Mechanical is included.
Install new h.w.h., boiler, bathroom and kitchen fixtures in the existing 2 story building. plumbing works as per plan. no change in egress, use, or occupancy.
replace existing ducts with new layout on existing existing HVAC system on portion of the 10 floor in conjunction with Alt # M01349165 as per plans filed