Search Building Permits
2,840 permits · HVAC · NY
Install (5) ductless hvac split systems and (1) ducted heat pump split systems
Install new boiler exhaust vent per plans.
Replace one gas boiler with three gas boilers, three gas hot water heaters and three gas meters. install one toilet and sink and gas re-pipe of entire building.
Remove and replace ceiling on cafeteria alongside first, second, and third floor corridors. Remove portions of exterior wall for HVAC access. Install new partitions in cellar to make new rooms. Replac...
SB 4th Fl:: Modifications of HVAC equipment and ductwork to accommodate alterations within the existing building as per plans filed herewith only.
Minor partition modification in cellar, replace hvac units on first floor and add hood over new electric pizza ovens.; no change to occupancy use or egress under this application.
Existing boiler to be replaced with combi boiler @ 2nd flr residence, relocated 3 plumbing fixtures of bathroom-2, kitchen sink @ 2nd fl residence, heating and hot water @ cellar. install (1) 3 compar...
Subsequent filing for kitchen hood and HVAC system modification in an existing retail space (Suite C06) as per the plans filed herewith. No change in use, egress or occupancy.
Modification of existing HVAC system on the 32nd Floor (Moroccanoil Office), including the installation of new units, and associated ducts and piping, as per plans. No change to use, egress, or occupa...
To file MS work type to Install new HVAC for unit H1R. No change in use, egress or occupancy under this application.
Herewith filing alteration subsequent to application # q01359805-i1 for plumbing work in cellar, first, second floors as per plans filed. install new (1)shower, (1)tub, (3)toilets, (3)bathroom sinks,...
Remedy ecb violation#39166318n. file a plumbing work type to reconnect the existing gas line for the existing gas furnace at the 1st floor only. no change in use egress or occupancy under this applica...
Addition and alteration of one family house to install new plumbing fixtures and related piping as per floor plan.Existing gas fired hot water heater and boiler will be removed.Existing wall mounted s...
Remove existing boiler and cap pipes. boiler id#10000003194n0001. there is no change of use, egress, or occupancy filed under this plan.
Installation of hvac to lead nb application
Modifications to existing HVAC system.
Removal of two (2) existing boilers and installation of two (2) two boilers in existing boiler room.
Replace six (6) existing 300 HP boilers with new, remove and install and connected accessories as per plans.
Filing Plumbing work to for a new natural gas service to transition boiler plant from fuel oil to dual-fuel.
To file BE work type to install boiler at the cellar. No change in use, egress or occupancy under this application.