168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Installation of GAF Timberline HDZ shingles on house and garage Replacement of siding on the garage
Replace entry and storm door no change in opening
Replacing 4 windows, 1 patio door and 1 entry door in existing openings
Replacing one window in the existing opening.
Replacing 3 windows- No changes to rough openings
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
3 replacement windows, no change in rough opening
Replacing 22 windows, like for like.
Install sash pack replacement windows at three locations: Upper Front Attic Window, West Side at Stair Landing Common Area, Lower Unit Front Window
R&R 12 DOuble hung windows and 1 casement
Replacing 2 patio doors
Construct/replace stoop and steps on front of existing sfd. -acw minimum landing size 36" by 36" hand rail must be 34" to 38" above nosing of treads (required if 4 or more risers)…
Replacing 4 windows
Replacing 3 windows
Tear off and install new vinyl siding
Remove & Replace Siding
remove and replace 1 entry door same size
Remove/replace 8 windows same size - no structural changes
Replace all siding on detached garage
Remove and replace 2 sq LP siding on house
Replacing 5 windows and 1 double sliding patio door- No changes to rough openings