Search Building Permits
5,396 permits · Roofing · NY
Interior renovation of 1 family brownstone at basement, 001, 002 and roof. minor structural work as per plans. no change in use, bulk, occupancy or egress.
Triplex. combination of apartments 2ab/3b as per tppn #3/97, new convenience stair connecting 1st & 2nd floors & smoke-proof partition, new convenience stair connecting 3rd & 2nd floor, new window. no...
Modifications to existing HVAC system and related piping including installation of rooftop units. Installation of commercial kitchen exhaust hood & ventilation system complete with UL-listed hood. No...
Modification to existing T-Mobile site. Replace 9 antennas, Install 6 RRU's and remove 9 RRU's on the roof. Install 1 cabinet and replace 1 cabinet on the roof.
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Installation of temporary roof protection as per drawings, roof protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Replace existing rooftop mechanical equipment. replace existing interior air handlers and humidifiers, and assoicated piping. no change to use, egress or occupancy.
Rebuild the water tank bulkhead with stairway on roof. no change of use, egress or occupancy.
Filing herewith tax abatement application for installation of roof mounted solar panels. no change in use, egress or occupancy.
Rooftop Solar Installation. No change to use, occupancy, or egress.
installation of solar panels, rooftop, railed, grid-tied, 27 modules, 11.745 kw
Installation of temporary roof protection as per drawings, roof protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Installation of solar panels on existing roof. no change in use, occupancy, or egress. no change in bulk. work is being paid for under job # x01208892-i1
Installation of new sprinkler heads and associated piping on the 46th floor (Rooftop Amenity) as per plans. No change to use, egress or occupancy.
Conversion of multi family to single family residence, revisions to stairs, partitions, kitchen, bathrooms and interior finishes. new roof framing, new stair bulkhead.
Existing garage to repair deteriorated walls and roof to restore to existing conditions,
Replacement of sheetrock throughout the cellar, first, and second floor. install the new dunage on the roof for the condensing units. there will be no change in use, occupancy, or egress.
Installation of 300psf sidewalk shed, roof protection and pipe scaffolding as per plans. all equipment shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this a...
Installation of 300psf sidewalk shed, roof protection and pipe scaffolding as per plans. all equipment shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this a...