168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Remove and Replace Gooseneck and provide interlock fan with new motorized damper on roof. Remove and Replace existing refrigerant lines from condensing unit to AC unit on roof.
Install safety railings on roof side of parapet at the roof level to meet FISP requirements.
Facade repair work on 1st -7th Floors and roof on all facades. For facade work only. No change to use egress of occupancy.
MQ202- Remove & replace existing Rooftop AC-1 & ACCU's and exhaust Fans to facilitate the roof replacement work undergoing at existing school, As per plans filed herewith .
Replacement of garage roof terraces, limited masonry repairs and garage roof repairs.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Replace existing sloped roof with new flat concrete with metal deck roof with new columns and footings. replace existing wall with new cmu wall on first floor. no change of use, eg…
exterior facade repairs and waterproofing
Installation of low roof area reroofing as per plans. no change in egress, use, or occupancy.
Direct replacement of (4) rooftop HVAC package units on existing roof curbs.
Propose to repair roof damaged by fire including the replacement of defective roof/ceiling framing, exterior sheathing and roofing, and interior ceiling finishes at the fourth floo…
Installation of 300 psf sidewalk shed, overhead protection, and roof protection as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress…
AT&T - Installation of non-emergency back up natural gas generator on the roof (15924951) as per plans. No change to use, egress or occupancy.
Replacement of existing (3) packaged rooftop units & (1) airhandling unit at the roof.
Installation of temporary roof protection as per plans. no change in use, egress or occupancy. shall comply with chapter#33 of 2022 nyc building code.
Install suspended scaffolding and sky stage ultra work cage and install roof hoist to perform facade exterior work. facade inspections to be done. sidewalk shed to be installed und…
Installation of material hoist for roof replacement and repairs. material hoist shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy un…
Facade repair work on 1st -7th Floors and roof on all facades. For facade work only. No change to use egress of occupancy.
New Mechanical unit for the second floor to MDF room and roof top unit to service that AC unit and 2 electric unit heaters in the cellar , as per plans.
Sidewalk and topping slab replacement, courtyard roof replacement, drain replacement, counter-flashing replacement and misc. repairs as per plans. no change in use, egress or occup…
Q180 - filing herewith for the mechanical work related to the exterior masonry, parapets and roof replacement of the existing school. there will be no change in egress, occupancy o…