168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Means & methods for structural alteration, filed in conjunction with m00945823-s4. includes phased selective demolitions of portions of levels & temporary shoring & bracing.
Demo detached 1 story house. On-site and off-site fill not to exceed 300 cubic yards.
General construction filed for demolition of non-bearing interior partitions and finishes as shown on plans filed herewith. No change in use, egress, or occupancy.
Job filed herewith (in conjunction with job# M01194094-S2) to cover interior soft demolition for the referenced floors. This work was filed with an ACP5 certifying this work does n…
Interior renovation and combination of existing coop apartment #9M & #9N. Work to include non-structural demolition, general construction, and finishes. Apartments combined in conf…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
removal of all interior walls, kitchen and bathroom from basement and 1st floor with Minor demolition from 2 thru 4. Interior work to be filed separately.
Construction fence filed for the demolition of an existing building and the construction of a new building.
Job filed herewith (in conjunction with job# M01194094-S2) to cover interior soft demolition for the referenced floors. This work was filed with an ACP5 certifying this work does n…
Full demolition to a two story building
Renovation of existing apartment # 16E on the 16th Floor. Work includes non-structural demolition and general construction as per plans filed herewith. No change to use, egress or…
First phase preparatory interior demolition of non bearing walls. No work to VCT or Mastic.
Construction fence filed for the demolition of an existing building.
Interior renovation of apt. 28de with minor demolition. remove non load bearing partitions per plans. no change in egress, occupancy or use is involved under this application.
Minor interior renovation of apartment # 98 on the 9th floor. Work includes non-structural demolition and general construction as per plans filed herewith. No change to use egress…
Full demolition of one story structure using hand held and mechanical means to assist.
We respectfully wish to remove and demolish the rear yard from the first floor as per plans.
Herewith filing for structural design and partial demolition of 2 story building subsequent to architect filing q01331319-i1
Full demolition to a five story building
Partial demolition of fire damage area, all work to be performed under dob emergency work order (ewo) number: 012826feu30601kr. demolition will be performed under the direction and…
Interior renovation of 8th floor apt with minor demolition of non-load bearing partitions. New finishes, non-load bearing partitions, and ceilings. No change in egress, occupancy o…