2,095 permits · Demolition · NY
Proposed: demolition and removal of all interior fit out down to sub-surfaces for apartment PHB ( 14th -16th floors). No enlargement proposed and party walls and fire walls to remain in their entirety...
Renovation of an existing apartment# 35B on 35th floor. Work includes non-structural demolition and general construction as per plans filed herewith. No change to use, egress or occupancy.
Full demolition on the existing 2-1/2 story detached residence.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 10th floor (CCRB), as per plans. No change to use, egress or occupancy.
Full demolition of a 2-story brick and steel with concrete building.
Proposed: demolition and removal of all interior fit out down to sub-surfaces for apartment PHB ( 14th -16th floors). No enlargement proposed and party walls and fire walls to remain in their entirety...
Interior renovation of apartment 22fg on 21st floor including non-structural demolition and instllation of new interior partitions and finishes as indicated on plans filed herewith. no change of use,...
FULL DEMOLITION OF EXISTING 2 ONE-STORY BUILDINGS at ADDRESS - 38-49 12th ST, QUEENS, 11101
Full demolition to a two story house
Legalization of an inground pool file to address violation
Full demolition on the existing 2-1/2 story detached residence.
Full demolition to a two story house
Modify existing sprinkler system to accommodate the renovated space. This include demolitions, relocation and new devi e installations. All modifications shall be performed in accordance with NYC BC,...
Ied: demolition of exposure-1, shoring on all floors. brick repairs
Selective removals Girl's Bathroom per design demolition notes and scope of work. Installation new accessible sink, mirrors, accessible mirror, push button door opener, remove and replace in Kind, flo...
Partial interior demolition and renovation of medical office 1j at cellar.
Minor interior renovations to existing Class A apartment 10HW on the 9th floor of an existing mixed-use building. Scope includes selective demolition of non-load-bearing walls, installation of non-loa...
Minor demolition with installation of new partitions on the 28th floor as per plans. No change to Use, Egress or Occupancy.
full demolition of existing 2-story building.
Selective removal of the existing facade on pine st and wall st, g-l05. removal of interior finishes on floors g-l1. no interior demolition on floors l2-l5. no change in use, egress, or occupancy
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com