Search Building Permits
2,860 permits · HVAC · NY
Interior renovation of the existing apartment #16e. removal of non-bearing partition, new interior finishes, new ductless air conditioning system. no change in use, occupancy or egress.
Replace oil boiler and burner. installation of four (4) - 330 gal. fuel oil tanks and abandon in-place the existing 5,000 gal. fuel oil tank. no change in use, egress or occupancy.
Replacement stairs and doors of boiler plant and tank/pump rooms in kind with existing. replacement concrete equipment pads.
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
Construct new elevator building addition. Provide new HVAC units with associated piping and ductwork for new building addition and accessible bathrooms throughout the building.
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
Proposed installation of new perimeter terminal air conditioning and heating units (PTAC) at living room and bedrooms. No change in use, occupancy or egress under this application.
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
Perform mechanical work inconjunction with existing ug6 eating & drinking establishment renovation. install split system hvac unit and bathroom ventilation. no change to use,egress, occupancy or fire...
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
Filing for pad extension related to boiler replacement/removal per plans filed. no change to use, egress or occupancy.
Replacement stairs and doors of boiler plant and tank/pump rooms in kind with existing. replacement concrete equipment pads.
Nycha boiler_replacement of existing vacuum and condensate pumps, installation of combustion air ductwork and flues for new domestic and hot water heaters.
Proposed installation of new fire rated wall in cellar for the installation of a new direct vent boiler/water heater combo unit to serve apartment 1r on 1st floor.
Nycha boiler- plumbing work as per plans filed herewith. no change to use, egress or occupancy. mechanical application filed under applicaiton # b00463459
Subsequent filing for plumbing work. install bathroom, kitchen, and boiler room. no change in use, egress, or occupancy.
Nycha boiler_replacement of existing vacuum and condensate pumps, installation of combustion air ductwork and flues for new domestic and hot water heaters.
Replacement stairs and doors of boiler plant and tank/pump rooms in kind with existing. replacement concrete equipment pads.
Nycha boiler - plumbing work as per plans filed herewith. no change to use, egress or occupancy.
Modification of existing mechanical systems to support the subdivision of a former single-tenant space into multiple tenant spaces. New HVAC units and ductwork are provided for common areas and lobby...