168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Plumbing work in conjuction with proposed ada bathroom. no change in use, egress or occupancy.
New plumbing system (gas, water, sanitary, vent) for new commercial restuarant and sprinkler heads at open kitchen only.
Plans depict existing conditions resulting from all work performed under alt-1 #101616262. this application filed under the rules of tppn 3/97. alt #101616262 to be withdrawn & plu…
Installation of new plumbing fixtures to accommodate new bar and kitchen equipment.
Plumbing work in conjunction with job #S01393492-I1. No change in use, occupancy or egress.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Renovation of existing cellar, basement, 1st and 2nd floor with plumbing work: relocate kitchen and bathroom fixtures; new boilers and hot water heaters in cellar; no change in use…
Repair of rear 12x25 one-story portion of existing two-family building, no changes to egress, use and/or occupancy; plumbing job to be filed under subsequent application
Plumbing works
Replace existing gas piping from roof to OSP to cellar and replace existing meter in cellar as per plans. Replacement of existing generator filed under application # M00674688. No…
Filing for dep site connection in exterior area only. all base building plumbing filed under q00934946_s5.new area drains and drywall are filed under q00934946_s5.
Renovation of existing cellar, 1st and 2nd floor with plumbing work:relocate kitchen and bathroom fixtures; new 2-pc restroom, washer,dryer, boilers and hot water heaters in cellar…
Proposed Sprinkler and plumbing work per plans.
Combination of 2 apartments into 1 - 2nd and 3rd fl units- no new c of o as per technicalpolicy and procedure notice #3/97- plumbing work in conjunction with the ot#b01320250-i1
Plumbing work as shown on plans
Replace plumbing fixtures on existing roughing
Site plumbing modifications as per plans filed herewith. No change in use, egress or occupancy.
Legalization of relocation and replacement of plumbing fixtures in apt 5G.
Lumbing work at ninth floor apartment 9e as indicated on plans. no change in use, egress, oroccupancy.
Installation of new storm piping, water/sanitary plumbing work subsequent filing to general construction (gc) filing.
Modifications to existing plumbing systems, as per plans.this includes updates to bathrooms and fixtures, a new beverage bar, etc. this scope of work does not contain any modificat…