12,483 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
CONVERT PORTION OF (E) SFD TO 754 SQ.FT ACCESSORY DWELLING UNIT PER GCS 66323(a)(1) AND ADDITION OF A 487 SF PATIO PER P/BC 2023-006."COMPLY WITH DEPARTMENT ORDER effective date 04…
Eplan: supplemental permit to 25016 - 20000 - 04819 to revise plans, site plan, and floor plans to create a powder room with non- load bearing walls and door
Supplemental to the permit # 25014-20000-03469 for the revision of foundation and footing details per inspector request.
Add sill plate anchor bolts and plywood to cripple walls (if existing) per LA City Standard Plan #1; no foundation replacement (Earthquake hazard reduction per Chapter 92 of the Lo…
(3)/Bathroom remodel for residential buildings (no structural changes).
Replace drywall (no new walls added) for single family dwellings and duplexes only.Kitchen remodel for residential buildings (no structural changes).
Supplemental permit to 25010-20000-03396.Revision to site plan to reflect the use of sump pump.
ePlan Supplemental for 24010-20000-03868 to change the permits from all-electric to gas.
Kitchen/(2)bathroom remodel for residential buildings (no structural changes)(3) Window change-out (same size & type) for residential buildings. Dual glazing,labeled and certified…
Supplemental permit to 25010-20000-02602 to revise foundation plans. capture calosha clearance.
Replace drywall (no new walls added) for single family dwellings and duplexes only.
Ti remodel to existing office, new non bearing interior partitions
ePlan Supplemental for 24010-20000-03867 to change the permits from all-electric to gas.
Kitchen/bathroom (3) remodel for residential buildings (no structural changes).
(ePLAN) Exterior improvements and interior core and shell to existing laundromat Building A. Work per engineer details.
Supplemental to 25016-10001-33223 to Update address and application type.
Stair repair with precast concrete tread over steel bracket steps on ex steel stringer per plan. and install new protective mesh for handrail/guardrail where openings are greater t…
EPLAN Supplemental TO 25010-20000-02570 to revise title 24 energy report
Supplemental to 23016-10000-00467 to change framing plan
1 bathroom(s).Bathroom remodel for residential buildings (no structural changes).