5,433 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Repair work to the existing facade, parapets and lightwells. new roof waterproofing to be installed.
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
Q849-Remove & replace with new A/C units on the Roof of existing school. As per plans.
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
Installation of photovoltaic solar array on existing roof system as per plans
Outriggers system installation for material hoist for facade/ roof repairs. No change in use, egress, or occupancy under this application.
Installation of (1) 20 ton air cooled packaged rooftop system and (1) 3 1/2 ton air cooled package rooftop system on 1st floor roof.
Seabury hall - facade restoration including localized brick and brownstone masonry repairs, roof replacement, restoration of stained and leaded-glass windows. no change in use, egr…
New non-load bearing partition, new counter, new stainless steel panels, plastering and painting. new hoods, ducts and exhaust at roof
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Structural temp shoring for top perimeter walls at roof and temp rebuilding of roof after fire. removal of fire damaged cornice and portions of parapet. emergency work order 120925…
Replace (1) hvac on roof as per plan; no change in use, egress or occupancy under this application.
Exterior Facade repairs and waterproofing, brick replacement, replacement of stone, pointing. No change in use egress or occupancy
Installation of pv system on existing rooftop. no changes to egress or use of occupancy.
Installation of PV system on existing roof no change to egress or use of occupancy
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Demolition taking place on the 1st, mezz, 2nd, and 3rd floors and on the roof as per plans filed herewith. no change in use, egress, or occupancy.
Installation of temporary overhead/ roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this a…
The structural work includes the following: provide new framing for cooling tower units, assess structural capacity of roof for new mep units
Reconfigure existing space w/new partitions,flooring, some partitions to remain, windows & doors, finishes, structural & ACM metal cladding. Existing structure remains. Store front…