11,156 permits · Renovation · NY
Facade repairs as per plans filed herewith. no change to use, egress, or occupancy
Applic. filed herewith for gen. const. renovation of the existg. health and fitness establishment (aka PCE). This filing is to update/amend the CO for obtaining extension of current expired BSA varian...
Filing sp for work related to interior alteration and fitout of 2nd floor of assembly restaurant
Interior renovation and mechanical hood of for commercial kitchen at basement floor #c9 as per plan filed herewith. no change in use, egress or occupancy.
This Alteration application is being filed for the mechanical work in conjunction with the Alt CO application #M01266123-I1. There are no change in use, egress or occupancy under this application.
Interior renovation of existing apt unit 3E and 3F on 3rd floor to install non-load bearing partitions and finishes in conjunction with Alt-1 application 120597540.
RENOVATION OF EXISTING APARTMENT #C1904 IN 19th FLOOR WITH GENERAL CONSTRUCTION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Sprinkler work in conjunction with interior office renovation on the 9th floor as shown on plans filed herewith. no change in use, egress, or occupancy.
Renovation of apartment 3 on the third floor. partition changes and renovation of kitchen, reconfiguration of bathrooms and new laundry room. new fixtures and finishes throughout.
Filing herewith the structural work related to the interior renovation, racking and high piled storage work. there will be no change in egress, occupancy our use.
Filing herewith drawings indicating interior renovation to unit 522. No change in use, egress or occupancy.
Exterior facade restoration as per plan. no change in use egress or occupancy.
Mechanical work associated with interior renovation of one-family residential building.
Apartment 14AB. Install new non load bearing partitions, flooring, ceilings and finishes per plans filed herewith. No change in egress use or occupancy.
Filing for General Construction work to erect temporary Egress to be used during Lobby renovations.
Suspended scaffold outrigger system for exterior inspection
Installation of ventless kitchen hood for existing store. no exhaust suct and fan.
Imc 9 fl: - modifications of interior partitions and finsihes at partial 9th floor within the existing hospital buildings as indicated on plans filed herewith. no change to use, egress or occupancy.
Interior renovations and modifications as per plans filed herewith. No change to use, egress or occupancy
Removal and installation of interior non-bearing partitions and related finishes as per drawings filed herewith. no change in use, egress, or occupancy.