Search Building Permits
1,319 permits · Pool & Spa · CA
merge 2 vacant commercial spacwe ( 2573 & 2575 mission ) to one commercial space (2575 mission st). proposed ti at first fl & reviving the mezzanine to accomodate new restroom/bar, new kitchen, new re...
turning 1st level garage to conditioned space w/ kitchen, half bath and living room. 2nd level is reorganized into 4 bedrooms, 3 full bath, laundry and family room. exterior new deck at 1st lvl from l...
EPLANGRADING PERMIT FOR NEW Swimming Pool with Spa PER ENGINEER DESIGN
Grading excavation for the new pool
Back fill the (e) pool - shell to be removed
ePLANInterior alteration to create a NEW SECURE SPACE WITHIN EXISTING WAREHOSUE AREA.Fire sprinkler NFPA-13 - throughout.
Major remodel, convert portion of garage to habitable space, addition (21' x 20') to garage and addition of (50'-10" x 21' irr shape) second story to existing single family dwelling. nfpa 13d fire spr...
***2025 WILDFIRE ELIGIBLE REBUILD PROJECT*** Supplemental Ref to PCIS#: 25030-30000-06108 to "Include Pool shell Removal"
(n) pool & spa construction per standard plan #268
ePlan: TENANT IMPROVEMENT OF AN EXISTING RETAIL SPACE WITH INTERIOR WORK TO INCLUDE NEW INTERIOR WALLS AND DOORS..
eplan: Interior remodel of Existing Office (B Occupancy) Space (Suite 1400). Improvement include: demo of non-bearing partitions and doors, New non- Bearing Partitions, Millwork, Ceiling System with N...
Remodel (e) pool inside (e) pool shell per standard plan and engineer details
NEW POOL PER LA CITY STD PLAN No. 268 AND ENG DETAIL S
EPLANNEW Swimming Pool with Spa PER ENGINEER DESIGN
Supplemental to permit #25047-20000-00128 to change contractor from john crystal pools to johnston vidal projects inc
to repair dry-rot at north wall of 1st floor commercial space, cafe, interior work only, to address complaint#202548311, not facing the street
1st fl & basement improvement: new non structural walls & partitions. new interior finishes, two new bathrooms, one new mother's room with sink, two new sink counters. mep modification. change of use...
1)remodel existing 1st floor including converting 62 sf of storage space to habitable space, enlarge(e) bathroom 2) remodel (e) kitchen at 2nd floor - this project does not remove a unit protectedunde...
additions to rear of house at first, second, and third floor. new stair to connect first and second floors, convert rear storage space to office, reconfigure and remodel third floor bathrooms and clos...
rev 201908068086-s1 & 202508213586:horizontal expanding at g/f to include a bedroom and play room. new g/f deck and stairs to garden below. and new deck above g/f horizontal expansion for floor 2.new...