172,912 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Suppl. permit to 25016-20000-19388 to revise the footing details
Add sill plate anchor bolts and plywood to cripple walls (if existing) per LA City Standard Plan #1; no foundation replacement (Earthquake hazard reduction per Chapter 92 of the Lo…
Existing (alteration/addition)
Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing 25 Squares. Class A roof covering is required within Very High Fire Hazard…
Grading - excavation for pool and spa
Supplemental permit 25016-30000-22872 to correct address from 3800 s bronson ave 1-3 to 3800 s bronson ave 1-6.
Dry-rot repair less than 10% of replacement cost of residential buildings. "COMPLY WITH DEPARTMENT ORDER effective date12/20/2023. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE".
EPLAN CONVERT 20' X 22'-4" IRREGULAR SHAPED PORTION OF ATTACHED GARAGE TO JADU PER GC66323(a)(1) and 66333 AND CONVERT THE REMAINING PORTION TO ADU PER LAMC12.22A.33(c) and(e) AND…
Eplan. Supplemental permit to 23010-10000-00926 for methane plans submittal for the methane mitigation system for level I design with modification for the elimination of the subsla…
Impact windows/door
Supplemental permit to permit 22010-10000-04155 to redesign 2nd floor and roof plan (pitch roof to flat roof), update structural plans and T-24 accordingly
Eplan . addition to existing single family house.
ePlan: CONVERT (E) COVERED PATIO IN 2-STORY ACCESSORY DWELLING UNIT TO 2-UNIT ACCESSORY DWELLING TO CREATE A 2-STORY 4-UNIT ACCESSROY DWELLING UNIT PER GC 66323(a)(4). NFPA-13R FIR…
Construction of a horizontal 2- story addition and vertical addition of attic and roof. no change in use, egress or occupancy.
NB FILING submitted. Three story, two family residence with on-site parking pad and Built In One Car garage.
Construction fence filed for this project
Foundation in conjunction with NB GC #B01259800-I1.
Install new plumbing fixtures as per plans filed
Excavate 12'-0 max below grade level with proper support of excavation means and methods: installations of soldier piles with wood lagging at front, bench & sloping excavation abov…
Nyu - kimmel hch7 pediatric inpatient unit make ready - general construction including modifications to existing floors, ceilings, partitions and doors as per plans filed herewith.…