11,156 permits · Renovation · NY
Interior renovations for dental office at 8th floor , no change to use, egress or occupancy
Interior renovation apartment 2c of existing 4 story building. construction work as per plan. install flooring, ceiling and painting throughout. no change in egress, use, or occupancy.
Apartment 14AB. Install new non load bearing partitions, flooring, ceilings and finishes per plans filed herewith. No change in egress use or occupancy.
Removal and installation of interior non-bearing partitions and related finishes as per drawings filed herewith. no change in use, egress, or occupancy.
Interior and exterior renovation of existing 3-story building as shown on plans. No change to use or occupancy.
Imc 9 fl: - modifications of interior partitions and finsihes at partial 9th floor within the existing hospital buildings as indicated on plans filed herewith. no change to use, egress or occupancy.
Interior renovation of existing 100 sqft kitchen within unit a5. no change in use, egress, or occupancy.
General construction associated with full interior renovation of three apartments in 3-story building including replacement of three windows. no chnage in occupancy, use or egress.
Replacement of existing louver on the 81st floor in an existing window frame. No change to egress use or occupancy
Herewith Filing Structural Work in conjunction with interior renovations, work includes the installation of concrete pads and steel supports for Mechanical equipment and new convenience stair opening...
Partial modification of the part of the non-bearing partitions and refurbish interior finishes at the 3rd-floor office. No change in use, egress, or occupancy.
Interior renovation of existing apartment unit as per plan. No change in use, egress, or occupancy under this application.
Repair Facade, replace Storefront & Windows to comply with LPC requirements. No change in Use, Occupancy and Egress.
Proposed interior renovation on partial 1st floor (apt#: 1). ceiling, flooring, partition works as per plan. no change in use, bulk, egress or occupancy.
General construction work in 2-family building with remove door, partition, new/repair partition, ceiling, floor, door and painting as per plan and mechanical work with install new split a.c. no chang...
Herewith filing for an interior renovation ,3 floor extension at rear yard and bulkhead erection; no change in use, occupancy or egress.
Interior renovations and modifications as per plans filed herewith. No change to use, egress or occupancy
Structural alterations for at existing two-family dwelling for vertical addition in conjunction with gc job #b01169654-i1
Addition of elevator & dumbwaiter shafts foundation . New foundation for support of existing concrete slab using new CMU walls at cellar. Addition of footing for handicap lift at the east entrance (sc...
Installation of hoist for facade repair & inspection.