168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Repair and reconstruction of low retaining wall (24 high), front yard pavement replacement, repointing of brick stairs, porch slab repair, and reconstruction of damaged brick pier.…
Exterior masonry repairs. no change in use, occupancy or egress under this application.
Unity Plaza Bldg 02, Exterior Repairs including Repairs of existing brick masonry, resecuring existing decorative panels, and Replacement of steel lintels.
Facade repairs as per plans submitted herewith. there is no change in use, egress or occupancy.
interior renovation to existing CVS Pharmacy to replace finishes (floor, wall, ceiling) Modify and relocate checkout and photo counters. Modify retail fixtures layout, replace and…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Conversion of two-family to one-family building. New interior stair connecting First Floor and Basement, new structural elements to support existing first floor at the new stair op…
Legalization of the work performed at the interior of the 2-family detached residence for the removal of non-load bearing walls, installation of interior walls including replacemen…
Facade exterior renovation of two story building
Faade Inspection Safety Program (FISP) Cycle 9 Repairs
Structural Garage Repairs as per plans filed herewith. No Change in Use, Egress, or Occupancy
Outrigger suspended scafolding used during facade repair work under job applicaiton number #q00942386
Facade and leak repairs as per plans; no change to use, egress, or occupancy.
hereby filing Installation of Interior Non-Bearing Partitions and Related Finishes as per Drawings filed Herewith. no change to use, occupancy or egress.
Exterior renovation for the front brick facade repair to address violation 39185626Z. No change in use, egress, or occupancy.
Cosmetic finishes for floor, walls, and ceiling. Installation of lighting fixtures... No change in egress, occupancy, or use under this application.
General construction work for interior partition work to combine apartments at the 3rd floor as per tppn #3/97. no change to egress, use or occupancy.
Facade repairs as per plans submitted herewith. there is no change in use egress or occupancy.
Minor renovation of Kitchen, Bathroom, Powder Room and closets - 12th Floor Apartment E.
Renovate exsiting one family dwelling, repair fire damage
Interior renovation to convert existing barber shop to be a Sushi Bar. No change to occupancy, use or egress