172,912 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Interior renovation of existing restaurant in Central Park as per plan. New finishes as per plan. No change to use, egress or occupancy under this application. Plumbing to be filed…
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Sprinkler plans and specifications herewtih filed for installation of wet sprinkler system in the entire building in accordance with nfpa 13r 2016 edition as modified by nyc bc 202…
Alteration/Tenant Finish
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Installation of temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
General construction as per plans filed herewith. no change to use egress or occupancy.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this applic…
Work includes partial demolition of existing walls and finishes as shown on plans. New convenience stair (PDA00007812), restrooms, & finishes on 5-7TH for a single tenant. Glass en…
Temporary tent for a outdoor dinner in Washington Mews. Removed at the end of the programing. No changes to existing structures, use or egress.
Interior renovation of apartment 15cd on the 013 floor, including partitions, and interior finishes. no change of use ,egress or occupancy.
Install exterior illuminated wall sign ( paradise construction)
Gas connecton to new gas boilers and replace water heater.
Propose plumbing work on existing partial 3rd and 4th floor in conjunction with ACO application as per plan. No change in use, egress, or occupancy.
Installation of new hvac equipment for heating, cooling, and ventilation.
Installation of new hvac equipment for heating, cooling, and ventilation.
(BARUCH HOUSES BUILDING # 11) Local Law 11/98 related facade and roof-bulkhead repair project. No change in use, egress or occupancy.
ADD TO THE EXISTING ATTACHED GARAGE AND CONVERT TO AN ACCESSORY DWELLING UNIT PER LAMC 12.22 A.33 (c) AND (e).
Remove and replace fire damaged and structurally compromised roof members in commercial structure
SUPPLEMENTAL PERMIT TO 18010 - 20000 - 04861 TO RENEW AND RECHECK PLANS PER CURRENT CODE (30% COMPLETION) AND UPDATE WORK DESCRIPTION TO " NEW 1-STORY ACCESSORY DWELLING UNIT TO CO…