5,354 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
K062-installation of roof drains & storm piping.
AT&T - Replacement of antennas with removal and installation of RRH units on roof. Retrofit of cabinets on existing equipment platform on roof. All work in compliance with TPPN 5/9…
K305-Remove and replace 14 existing Roof drains and associated piping and strainers, Replace 2 area yard drains at open space by side of the building .ground level, as per plans fi…
installation of solar panels, rooftop, railed, grid-tied, 19 modules, 7.79 kw
Installation of photovoltaic solar array on existing roof system as per plans
Application filed herewith to repair exist. steam radiator heaters, roof exhaust fans and related piping and ducts. no change in use. no change in occupancy. no change in egress. n…
Installation of photovoltaic solar array on existing roof system as per plans
Installation and use of temporary roof & overhead protection as per plans filed herewith. no change to use, egress or occupancy under this application.
Application filed herewith to replace existing deteriorated wood joists and wood bearing partitions located in the area of the bathrooms and kitchens. also rebuild deteriorated par…
Hereby filing roof repairs and terrace enhancement at the 10th Floor and 10th Floor Bulkhead as per Plans. No Change to use, egress, or occupancy.
Installation of suspended scaffold & material hoist for roof replacement & rooftop structure renovation. suspended scaffold & material hoist shall comply with chapter 33 of the 202…
Remove and replace 10 existing roof drains to accommodate installation of new roofs A, D and C. Remove existing combined house trap and install new dedicated house sanitary trap an…
K202 : Remove and Replace (5) 3 Gas Vents, (6) 2 gas vents, (3) 1-1/2 gas vent, (1) 1 1/4 gas vent and (1) 1 gas vent. Also remove and replace 13 Roof Drains and Reflash and Extend…
Gc/str work includes, but not limited to, minor concrete repair, replacement of cmu blocks and fireproofing of steel beams in cellar + sub-cellar level of parking garage. no change…
installation of solar panels, rooftop, railed, grid-tied, 24 modules, 10.44 kw
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
Installation of temporary roof & overhead protection as per plans filed herewith. no change to use, egress or occupancy under this application.
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Installation of solar panels on existing roof. no change in use, occupancy, or egress. no change in bulk
installation of solar panels, rooftop, railed, grid-tied, 50 modules, 20.5 KW