Search Building Permits
2,077 permits · Demolition · NY
Demolition and general construction work on partial 25th floor as per plans. No change to use. egress or occupancy.
Structural modifications associated with Rockefeller Research Lab (Pavilion Enabling) Parking Garage alteration. Scope to include, but not limited to, partial demolition, reinforced concrete, structur...
Full demolition to a one story building
Filing Plans for, sequence, means and method for the proposed partial demolition of existing 5 story buildings, in conjunction with Alt I # 121188320
The scope of work is limited to the selective demolition of existing interior non-bearing partitions and associated finishes. no building systems areproposed to be modified or altered as part of this...
Renovation of commercial space in existing building on 1st floor . work to include demolition and new interior layout, doors, finishes & replcaement of exterior storefront & doors as per plans. no cha...
Minor demolition with installation of new partitions on the cellar and 1st floors as per plans. No change to Use, Egress or Occupancy.
Filing herewith for the demolition to existing cellar and 1st floor as indicated per plans. There is no change to use, egress, or occupancy.
Partial demolition associated with the renovation of the existing building, as shown on the plans filed herewith.
Demolition of building in conjunction with adjacent buildings 2148 and 2138 Flatbush Avenue.
Interior renovation of an existing 3-story building, conversion from rest+cabaret&two-family to a two-family dwelling as shown in plans. partial demolition at rear. installation of a metal deck at the...
Interior demolition of an existing commercial space. no change in use and occupancy; no change in egress.
Full Demolition of a 4 1/2-Story Residential Building
Replace left side existing siding in existing 2.5 story building.demolition work and construction work as per plan. no change in egress, use, or occupancy.
Removal of non-load bearing interior partitions and all mechanical equipment in association with full building demoltion, by others. there is no change to use, egress, occupancy, or fire protection.
Support of excavation to accommodate removal of remnant foundation walls at the existing demolition site.
Demolition of all existing equipment, duct work and risers
construction fence will be used to protect site during full demolition
Demolition of all existing equipment, duct work and risers
Renovation of commercial space in existing building on 1st floor . work to include demolition and new interior layout, doors, finishes & replcaement of exterior storefront & doors as per plans. no cha...