168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
This application to be filed for mechanical work type in conjunction with alt-1 application # 240291028
Mechanical work file in conjunction with changing a existing two family dwelling to a single family dwelling.
Installation of temporary site-specific engineered enclosure system as per BC 2022 Chapter 33 Section 3309.17 as the alternative to the adjoining property protection plan. No chang…
Installation of a three personnel/material hoists. car1 shall be 7000# capacity. cars2&3 shall be 6000# capacity during new building const filed sep. hoists shall comply with the 2…
Interior renovation of existing commercial space with removal & installation of non-load-bearing partitions, new partitions,ceiling & finish work, & minor electrical work. No chang…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Nyu-infrastructure mer - installation of hvac equipment including chillers, cooling towers, air handling units, air terminal units, etc., and installation of all associated ductwor…
Nyu - infrastructure package - new generator and associated piping according to plans filed herewith. no change to use, egress or occupancy.
General Construction & Mechanical related work in conjunction with Boiler Replacement. Modification to existing tank room to accommodate installation of new hot water heaters and n…
General construction and mechanical related work in conjunction w/ Boiler replacement. Modification to existing tank room to accommodate installation of new hot water heaters for h…
General Construction & Mechanical related work in conjunction with Boiler Replacement. Modification to existing tank room to accommodate installation of new hot water heaters and n…
Reconfiguration of duct layouts to coordinate with Architectural changes on the second and third floors of the school. Replacement of existing air handling unit serving third floor…
Storage of material / equipment on top of heavy duty sidewalk shed. storage shall not exceed 25 psf. shed filed under separate application. storage shall comply with ch#33 of the n…
Installation and use of temporary knuckleboom as per plans filed herewith. no change in use egress, or occupancy
Installation of system stair tower as per plans. system stair tower shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Install new chimney liner as per plans. no change to use, occupancy or egress.
Addition of new split system air conditioner, including associated ductwork,piping, and controls to unit 801-2.
Mechanical work on 4th floor as per plans filed herewith. no change in use, egress, or occupancy.
Interior renovation of mechanical ductwork throughout. No changes in use, egress, or occupancy.
Mechanical modifications taking place on 12th floor as per plans filed herewith. no change in use, egress, or occupancy.
Mechanical work on first and cellar floors related to application #m01141098-i1