3,933 permits · Demolition
Interior demolition and installation of new subfloor and non-load-bearing demising wall. Future tenant fit-out under separate permit. Subdivision of existing store. No change to egress, floor area, or...
Eplan. Offsite sign demolition with takedown credit applied to LA Metro TCN FF-1.Double face sign with 72-sf panels.OSPPIP case #276761 (No SPI required).original permit#81LA21955
Full Demolition - Complete demolition to create a vacant lot.
Demolish existing smaller size deck with steps and install new 20'0" x 12'0" maintance free deck with intermediate landings and steps to existing single family house. aaj (project dox plans). demoliti...
Demolition - Interior
Demolition - Interior
Demolition - Interior
1st flr-horizontal addition @ rear yard w/ bedrm,bathrm,office & storage;convert (e)garage area into (conditioned space w/ laundry rm & mudrm;(n) interior stairs conneting 1st & 2nd flr;4)excavate gra...
Make Safe Permit For RP - MAKE SAFE PERMIT TO COMPLY WITH CF-2025-049080 TO INCLUDE SHORING, PARTIAL DEMOLITION, REPLACEMENT OF EXTERIOR REAR WALLS AND FRAMING PER APPROVED PLANS AND IN ACCORDANCE WIT...
Minor Demolition - FOR THE COMPLETE DEMOLITION OF THE ATTACHED TWO-STORY STRUCTURE BY HAND AND HAND HOLD DEVICES. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURIN...
Proposed temporary construction for the demolition of the existing structure and the new construction.
Demolition of existing non-load bearing partitions w/in apartment 20g
full demolition of house
6 - Wreck
Mechanical Design for: 1) Replacement of chillers and demolition of cooling towers 2) Installing fully variable reheat hot water system 3) Upgrading BMS 4) Recovering waste heat from the cold storage...
Full Demolition of 1-story wood framed structure
Filed pursuant to article i, chapter v of the nyc zoning resolution and article 7b of the nys multiple dwelling law for residential conversion including partial demolition and permitted reconstruction...
Interior renovation @ 2nd fl apartment, work to partitions demolition, new partitions, replace floor and interior finishes throughout only. no change in use egress, or occupancy..
Interior demolition of non structural partitions, ceiling tiles, fixtures and finishes on floors 4, 5 and 6 in existing building
Full Demolition of a 1-story wood framed structure
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com