168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
T/I SUITE 350 const type: IA occupancy: B 2020 MCCEB, LEVEL 2 occupant load: 146 sprinklered: YES architect: 59613 - Santema, Jolene Lorraine @ BDH
Replacing radios on telecom site. (jjl) engineer: tim alexander #61982
Install a solar pv system on roof of building. collector capacity __40.020__ kw solar checklist attached. meets or exceeds srcc cert per mn rules 1325.1100 subp.5a as applicable. a…
Tenant Improvement - FedEx Office - Accessory to hotel certificate of occupancy required: no special inspections required: no SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING…
parking garage structural repairs and waterproofing. engineer: Deiss #26604
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Remove existing roofing. Install new shingle roof system complete with required underlayment, flashing and trim.
Remove existing roofing. Install new shingle roof system complete with required underlayment, flashing and trim.
Level 2 alteration. basement of existing building. must have 7' min clear height in the basement. (jjl) **existing space previously approved under bldg923238 certificate of occupan…
SUITE 825. TENANT REMODEL. NO STRUCTURAL WORK. (JJL) Tenant interior remodel. NOTE: BLDG1150103 is the original permit number. Scope changed from spec suite to tenant build out. ce…
RE-ROOF FLAT ROOF 2020 MSBC architect: 60490 - Behrens, Kaliann Rose
Demo and re-roof. (jjl)
Fire damage repair. rigid foam insulation. finishes. no changes to existing floor plan. (jjl)
Remove existing siding and replace with new siding. (jjl)
Remove existing siding and replace with new siding. (jjl)
CHANGE OF USE - RESTAURANT const type: VB occupancy: A-2 2020 MSBC occupant load: 117 sprinklered: NO 10/9/25 - Determination rcvd (0 charges) 251008C1 architect: 48654 - Haecker,…
Install a solar pv system on roof of building. collector capacity _71.3___ kw solar checklist attached. meets or exceeds srcc cert per mn rules 1325.1100 subp.5a as applicable. add…
New dog daycare in existing space -ACW certificate of occupancy required: no special inspections required: no const type: II-B occupancy: B 2020 MSBC occupant load: 48 Tenant: Ruff…
remodel store front including accessible entry, doors, windows, and wall finishes. encroachment permit issued for sloped walk and steps/railings certificate of occupancy required:…
Residing portion of building -ACW certificate of occupancy required no special inspections required no 2020 MSBC
(dmh-pdox) new shower surround and kitchen remodel and kitchen flooring in unit #505. install fiber-cement or glass mat gypsum backers for ceramic tile finishes at bathtub/shower l…