Search Building Permits
2,106 permits · HVAC · TX
Finish out - No construction. Shell building plans were approved to full finish out. No additional updates proposed. matches Occupany request no change of use. No access control. Reference 2024-077586...
New construction two-family residential secondary apartment 2-story 2 bedroom 1.5 bath with covered front porch.
11628 Ladera Vista Dr Unit B: New 2-story duplex unit 3 bedroom 2.5 bath 1-car garage.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [4bed 4bath] with Habitable Attic Attached Garage
Finish out - No construction. Shell building plans were approved to full finish out. No additional updates proposed. matches Occupany request no change of use. No access control. Reference 2024-077586...
Briscoe 820-N-R Is a New one-story single-family residence with (3) bedrooms (2) bathrooms an attached two-car garage and a covered entry porch & patio.
Hughes 841-M-L Is a New one-story single-family residence with (4) bedrooms (3) bathrooms an attached two-car garage and a covered entry porch & patio.
Replacement of complete existing central heat and air system with or without duct work
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [5bed 4.5bath] with Attached Carport.
Removed and replace existing pool size for size. No change to existing pool footprint/existing pool enclosure to remain. FLR 2
Finish out - No construction. Shell building plans were approved to full finish out. No additional updates proposed. matches Occupany request no change of use. No access control. Reference 2024-077586...
Replacement of complete existing central heat and air system with or without duct work Install replacement of 2.5 Ton Heat Pump and Repair Or Rebuild Of The Supply Air Plenum
Remodel existing 1st floor hospital areas
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [5bed 3.5bath] with Attached Garage
Replacement of complete existing central heat and air system with or without duct work The Healing House - Replacing like for like 3T Vert Gas System.
PHASE 4 for TCO-L1: IL unit expansion & bridge courtyard & garage renovations + L2: IL unit expansion & bridge Chapel & Fitness renovation + L3: IL Unit expansion and bridge 6605 total SF Phase 4
Express: Replace 11 windows; tub to shower conversion; replace HVAC
Addition - Addition of mudroom laundry room primary bedroom & bath and family room. Interior remodel of kitchen dining room and second floor remodel to create bathroom