168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
No work - temp occ only - pending completion of landscaping under bda-2024-01089 and related swp-2024-14671
New construction, addition, gfa change - for the erection of a rear addition on an existing attached structure. size and location as shown in plans.
New construction, addition, GFA change - addition of a canopy, installation of utility transformer, switchboard assembly, (6) 400KW HYC400 chargers, and conversion of (12) regular…
New construction - for the erection of a two (2) story attached structure of type v-b construction for use as a single-family dwelling (group r-3). building to be fully sprinklered…
New construction - completion of a structure where construction started under permit 551323 - erection of an attached structure for use as single family household living. sheeting…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
New construction - for the installation of two (2) new fire suppression systems (one for each dwelling unit) to include a 1" combined service for each system in accordance with nfp…
New construction - completion of a structure where construction started under permit 551324 - erection of an attached structure for use as single family household living. sheeting…
New construction - for the installation of an automatic fire suppression system in accordance with nfpa 13d throughout two-story building to include 1-inch combined water service l…
New construction - completion of a structure where construction started under permit 551325 - erection of an attached structure for use as single family household living. sheeting…
New construction - completion of a structure where construction started under permit 551325 - erection of an attached structure for use as single family household living. sheeting…
New construction, addition, gfa change - for the erection of an attached structure to include a roof deck and roof deck access structure. size and location as shown in plans.
New construction, addition, gfa change - for the erection of a vertical addition on an existing attached structure. size and location as shown in plans.
New construction, addition, GFA change - For the erection of an addition to the rear of an existing attached structure. Size and location as shown in plans.
New construction, addition, gfa change - for the erection of a rear addition on an existing attached structure. size and location as shown in plans.
New construction, addition, gfa change - for the legalization of an existing attached two (2) story structure; and for the erection of a third story addition above an existing two…
New construction, addition, gfa change - for additions to the second and fourth floors with a solar canopy structure above an existing roof deck accessed by the fouth floor of an e…
New construction, addition, gfa change - for the erection of an attached structure with a roof deck above. size and location as shown in the application / plans.
New construction, addition, gfa change - for the erection of a detached accessory structure. size and location as shown in application/plans.
New construction - for the erection of a three (3) story attached structure of type v-b construction with roof deck and roof deck access structure for use as a single-family dwelli…
New construction - for the erection of an attached structure as per approved plans. building to be fully sprinklered per nfpa 13d. separate permits required for mep & fp work.