168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Removal of existing tiles and fins only to the extent required and as indicated on plans. No change to egress, use, or occupancy.
Installation of sidewalk shed and supported scaffold as shown on drawings. no change in use egress or occupancy. we shall comply with chapter 33 of 202 b.c
Installation of heavy duty sidewalk shed and construction plywood fence as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress o…
General Construction to take place on the 41st through 43rd Construction Floor as per drawings filed herewith. No change in use, egress, or occupancy. (Listed as 42nd thru 44th Mar…
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy. the pipe scaffold is at the top of the sidewalk shed at the west street and bethune str…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
General Construction to take place on the 15th floor as per plans filed. No change in use, egress, or occupancy.
Installation of new sidewalk shed at 420 east 169th street, bronx, ny 10456 as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Proposed new two-family, two-story with basement and cellar filed herewith 3 tax lots, one zoning lot.
Proposed new two-family, two-story with basement and cellar filed herewith 3 tax lots, one zoning lot.
Installation of construction fence for public protection during construction work
For temporary construction equipment (fence), submitting on behalf of contractor, no change in use, occupancy or egress
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Installation of sidewalk shed for public protection during construction work.
New infill slabs at level 2, new stair and existing MEP openings. New core drilled and saw cut MEP slab penetrations. New built up slabs on level 2 &3.
Install temporary construction fence
Installation of 300psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this application.
Installation of new sidewalk shed at 69 west 225 street, bronx as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Installation of new sidewalk shed at 5210 broadway, bronx as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Installation of new sidewalk shed at 49 west 225 street, bronx as indicated on plans. there will be no change in the use, egress, or occupancy under this application.